Kali Metals Limited (ASX: KM1) (“Kali” or “the Company”) is pleased to release the first assay results from its
Phase II drilling program at its Marble Bar Gold Project.
Highlights
• Initial assay results received from the Phase II reverse circulation (RC) drilling program at the Marble Bar
Gold project.
• The Phase II drilling program is now complete, and consisted of 4,059m of reverse circulation drilling and
281.7m of diamond drilling, to follow up on the encouraging results from the Phase I program completed
in December 20251
.
• Initial results from the Tiger II Prospect are from the down dip extension of the previous Phase I drilling
intersection of 2m @ 4.1 g/t gold from 17m1
.
• Significant results from this section using a 0.5 g/t gold cut-off include:
• 2m @ 1.6g/t from 29m in Hole MBRC079
• 2m @ 1.6 g/t from 29m in Hole MBRC080, and 3m @ 0.6 g/t from 34m
• 3m @ 3.6 g/t from 41m in hole MBRC081,
• 5m @ 1.0 g/t from 41m in Hole MBRC082
• Mineralisation, consisting of quartz veining with potassic alteration and sulphides, is open down dip.
• Kali is expecting to receive the remaining RC results and extensional soil sampling program results within
the next few weeks, to be followed by results from the diamond drilling, expected during July.
Managing Director of Kali Metals, Paul Adams commented,
“The Phase II drilling program is focused on advancing our understanding of the Marble Bar gold system
by both tightening drill spacing across the key Sherman, Churchill and Tiger prospects, and testing for
extensions at depth.
These early results demonstrate that gold mineralisation of similar width and tenor, continues down dip
of the surface-lying Phase I results. The presence of thicker zones of alteration are indicative of the
potential of the system to expand at depth.
Kali looks forward to being able to release further results as they become available, including results
from the diamond drilling portion of the program, and importantly, results from the soil sampling
program over the three newly acquired tenements, as well as the mapping and rock-chip sampling over
the newly identified prospects. This technique, combined with high-resolution digital imagery, was
instrumental in the definition of drill targets at Marble Bar in the first instance.”
1.
KM1 ASX Announcement 29 January, 2026
ASX : KM1 Page 2 of 12
Kali Metals Limited 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Figure 1. New down-dip RC drilling results at Tiger 2 Prospect, Marble Bar Gold Project
Activities Scheduled for Q1 FY 27
1. Assays received and interpretation of remaining RC and diamond drilling results at Marble Bar
2. Receipt and interpretation of soils program and rock chip sampling results over the Peggy and
Florence tenements, aiming to extend the known gold systems through these areas.
3. Acquisition and interpretation of high-resolution hyperspectral survey over both the Marble Bar and
DOM’s Hill tenement packages with the aim of generating additional prospects / targets
4. Release of soils results at Mt Cudgewa in the Southern Lachlan Fold Belt in Victoria
5. Initiation of 2026 drilling and field campaign at the Higginsville Lithium Project
Authorised for release by the Board of Kali Metals Limited.
For further information please contact:
Paul Adams
Managing Director
E admin@kalimetals.com.au
Andrew Willis
Investor & Media Relations
E awillis@nwrcommunications.com.au
ASX : KM1 Page 3 of 12
Kali Metals Limited 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
About Kali Metals Limited
Kali Metals’ (ASX: KM1) portfolio of assets cover 4,029km2
of exploration tenure prospective for gold, lithium
and critical minerals, located in WA (including the Pilbara and Eastern Yilgarn) and the Southern Lachlan Fold
Belt (in NSW and Victoria).
Kali Metals has a team of well credentialed professionals who are focused on exploring and developing
commercial resources and identifying new strategic assets to add to the portfolio. Kali Metals has a number
of prospective gold, lithium and tin Projects within its existing tenure and is committed to generating
shareholder value through exploration and development of these assets.
Forward Statements
This document may include forward-looking statements. Forward-looking statements include, but are not
limited to, statements concerning Kali’s planned exploration program and other statements that are not
historical facts. When used in this document, the words such as "could," "plan," "estimate," "expect," "intend,"
"may”, "potential", "should," and similar expressions are forward-looking statements. Although Kali believes
that its expectations reflected in these forward-looking statements are reasonable, such statements involve
risks and uncertainties, and no assurance can be given that actual results will be consistent with these forward-
looking statements.
Competent Persons Statement
The information in this report that relates to Data and Exploration Results is based on and fairly represents
information and supporting documentation compiled and reviewed by Mr Mladen Stevanovic a Competent
Person who is a Member of the AusIMM and Exploration Manager at Kali Metals. Mr Stevanovic has sufficient
experience relevant to the style of mineralisation and type of deposit under consideration and to the activity
which he has undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian
Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Stevanovic consents
to the inclusion in the report of the matters based on his information in the form and context in which it
appears.
Previously Reported Results
The information in this announcement that relates to Exploration Results is extracted from the ASX
announcements (Original Announcements), as referenced, which are available at www.kalimetals.com.au. The
Company confirms that it is not aware of any new information or data that materially affects the information
included in the Original Announcements and, that all material assumptions and technical parameters
underpinning the estimates in the Original Announcements continue to apply and have not materially changed.
The Company confirms that the form and context in which the Competent Persons’ findings are presented
have not been materially modified from the original announcement.
Annexure A – Marble Bar Tenements
Marble Bar Project:
E45/4700 E45/7037
E45/5970 E45/7036
E45/6389 E45/7150
E45/6429 E45/7151
E45/6430
ASX : KM1 Page 4 of 12
Kali Metals Limited 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Annexure B – Reported Results
Table 1: Reported Drillholes Details (all holes are vertical RC; coordinates in GDA94/MGA50)
Table 2: Reported Drilling Results (Part 1/2)
HOLEID EAST NORTH RL DEPTH TenementID Prospect
MBRC078 796015.08 7649706.32 215.48 37 E45/6389 Tiger II
MBRC079 796031.30 7649719.07 215.37 37 E45/6389 Tiger II
MBRC080 796047.57 7649731.88 214.80 55 E45/6389 Tiger II
MBRC081 796062.29 7649741.35 214.61 67 E45/6389 Tiger II
MBRC082 796080.48 7649757.44 214.36 67 E45/6389 Tiger II
MBRC083 796096.00 7649770.02 214.01 79 E45/6389 Tiger II
HOLE ID
Depth
From
Depth
To
Au_ppm HOLE ID
Depth
From
Depth
To
Au_ppm HOLE ID
Depth
From
Depth
To
Au_ppm
MBRC078 0 1 0.013 MBRC079 0 1 0.012 MBRC080 0 1 0.012
MBRC078 1 2 0.006 MBRC079 1 2 0.004 MBRC080 1 2 0.003
MBRC078 2 3 0.004 MBRC079 2 3 0.003 MBRC080 2 3 0.001
MBRC078 3 4 0.003 MBRC079 3 4 0.001 MBRC080 3 4 0.001
MBRC078 4 5 0.001 MBRC079 4 5 0.002 MBRC080 4 5 0.001
MBRC078 5 6 0.001 MBRC079 5 6 0.001 MBRC080 5 6 0.001
MBRC078 6 7 -0.001 MBRC079 6 7 0.002 MBRC080 6 7 0.002
MBRC078 7 8 -0.001 MBRC079 7 8 -0.001 MBRC080 7 8 0.001
MBRC078 8 9 0.002 MBRC079 8 9 0.002 MBRC080 8 9 0.001
MBRC078 9 10 0.002 MBRC079 9 10 0.001 MBRC080 9 10 0.001
MBRC078 10 11 0.001 MBRC079 10 11 -0.001 MBRC080 10 11 0.002
MBRC078 11 12 -0.001 MBRC079 11 12 -0.001 MBRC080 11 12 0.001
MBRC078 12 13 -0.001 MBRC079 12 13 0.001 MBRC080 12 13 0.005
MBRC078 13 14 0.001 MBRC079 13 14 -0.001 MBRC080 13 14 0.001
MBRC078 14 15 0.001 MBRC079 14 15 0.001 MBRC080 14 15 0.001
MBRC078 15 16 -0.001 MBRC079 15 16 -0.001 MBRC080 15 16 0.001
MBRC078 16 17 0.011 MBRC079 16 17 -0.001 MBRC080 16 17 -0.001
MBRC078 17 18 0.006 MBRC079 17 18 -0.001 MBRC080 17 18 0.002
MBRC078 18 19 0.001 MBRC079 18 19 0.001 MBRC080 18 19 -0.001
MBRC078 19 20 0.007 MBRC079 19 20 0.001 MBRC080 19 20 0.001
MBRC078 20 21 0.002 MBRC079 20 21 -0.001 MBRC080 20 21 0.001
MBRC078 21 22 0.032 MBRC079 21 22 0.001 MBRC080 21 22 -0.001
MBRC078 22 23 0.008 MBRC079 22 23 -0.001 MBRC080 22 23 -0.001
MBRC078 23 24 0.65 MBRC079 23 24 -0.001 MBRC080 23 24 0.001
MBRC078 24 25 0.1 MBRC079 24 25 0.018 MBRC080 24 25 -0.001
MBRC078 25 26 0.52 MBRC079 25 26 0.001 MBRC080 25 26 -0.001
MBRC078 26 27 0.2 MBRC079 26 27 0.001 MBRC080 26 27 -0.001
MBRC078 27 28 -0.04 MBRC079 27 28 0.004 MBRC080 27 28 -0.001
MBRC078 28 29 -0.03 MBRC079 28 29 0.002 MBRC080 28 29 -0.001
MBRC078 29 30 0.98 MBRC079 29 30 1.41 MBRC080 29 30 0.001
MBRC078 30 31 0.001 MBRC079 30 31 1.88 MBRC080 30 31 -0.001
MBRC078 31 32 -0.001 MBRC079 31 32 0.25 MBRC080 31 32 0.001
MBRC078 32 33 -0.001 MBRC079 32 33 0.015 MBRC080 32 33 0.011
MBRC078 33 34 0.003 MBRC079 33 34 0.005 MBRC080 33 34 0.011
MBRC078 34 35 0.001 MBRC079 34 35 0.006 MBRC080 34 35 0.86
MBRC078 35 36 0.001 MBRC079 35 36 0.002 MBRC080 35 36 0.3
MBRC078 36 37 -0.001 MBRC079 36 37 0.001 MBRC080 36 37 0.78
MBRC080 37 38 0.25
MBRC080 38 39 0.17
MBRC080 39 40 0.013
MBRC080 40 41 0.01
MBRC080 41 42 0.005
MBRC080 42 43 0.006
MBRC080 43 44 0.001
MBRC080 44 45 0.001
MBRC080 45 46 0.001
MBRC080 46 47 0.001
MBRC080 47 48 1.28
MBRC080 48 49 1.87
MBRC080 49 50 -0.001
MBRC080 50 51 -0.001
MBRC080 51 52 -0.001
MBRC080 52 53 -0.001
MBRC080 53 54 0.001
MBRC080 54 55 -0.001
ASX : KM1 Page 5 of 12
Kali Metals Limited 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Table 2: Reported Drilling Results (Part 2/2)
HOLE ID
Depth
From
Depth
To
Au_ppm HOLE ID
Depth
From
Depth
To
Au_ppm HOLE ID
Depth
From
Depth
To
Au_ppm
MBRC081 0 1 0.008 MBRC082 0 1 0.004 MBRC083 0 1 0.002
MBRC081 1 2 0.002 MBRC082 1 2 0.003 MBRC083 1 2 0.003
MBRC081 2 3 0.002 MBRC082 2 3 0.01 MBRC083 2 3 0.002
MBRC081 3 4 0.002 MBRC082 3 4 0.002 MBRC083 3 4 0.002
MBRC081 4 5 0.001 MBRC082 4 5 0.001 MBRC083 4 5 0.002
MBRC081 5 6 0.001 MBRC082 5 6 0.001 MBRC083 5 6 0.002
MBRC081 6 7 0.009 MBRC082 6 7 0.001 MBRC083 6 7 0.002
MBRC081 7 8 0.001 MBRC082 7 8 0.001 MBRC083 7 8 0.002
MBRC081 8 9 0.001 MBRC082 8 9 -0.001 MBRC083 8 9 0.001
MBRC081 9 10 0.001 MBRC082 9 10 0.001 MBRC083 9 10 0.002
MBRC081 10 11 -0.001 MBRC082 10 11 0.001 MBRC083 10 11 0.001
MBRC081 11 12 -0.001 MBRC082 11 12 0.001 MBRC083 11 12 -0.001
MBRC081 12 13 -0.001 MBRC082 12 13 -0.001 MBRC083 12 13 0.001
MBRC081 13 14 -0.001 MBRC082 13 14 0.001 MBRC083 13 14 0.001
MBRC081 14 15 -0.001 MBRC082 14 15 0.004 MBRC083 14 15 0.001
MBRC081 15 16 -0.001 MBRC082 15 16 0.001 MBRC083 15 16 0.001
MBRC081 16 17 0.002 MBRC082 16 17 0.001 MBRC083 16 17 0.001
MBRC081 17 18 -0.001 MBRC082 17 18 0.001 MBRC083 17 18 0.001
MBRC081 18 19 0.001 MBRC082 18 19 0.001 MBRC083 18 19 0.004
MBRC081 19 20 -0.001 MBRC082 19 20 0.001 MBRC083 19 20 0.002
MBRC081 20 21 -0.001 MBRC082 20 21 0.001 MBRC083 20 21 0.001
MBRC081 21 22 -0.001 MBRC082 21 22 0.002 MBRC083 21 22 0.001
MBRC081 22 23 -0.001 MBRC082 22 23 0.027 MBRC083 22 23 0.001
MBRC081 23 24 -0.001 MBRC082 23 24 0.004 MBRC083 23 24 0.001
MBRC081 24 25 -0.001 MBRC082 24 25 0.001 MBRC083 24 25 0.047
MBRC081 25 26 -0.001 MBRC082 25 26 0.001 MBRC083 25 26 0.001
MBRC081 26 27 0.003 MBRC082 26 27 -0.001 MBRC083 26 27 0.001
MBRC081 27 28 0.001 MBRC082 27 28 -0.001 MBRC083 27 28 -0.001
MBRC081 28 29 0.001 MBRC082 28 29 -0.001 MBRC083 28 29 0.001
MBRC081 29 30 0.001 MBRC082 29 30 -0.001 MBRC083 29 30 0.001
MBRC081 30 31 0.001 MBRC082 30 31 0.001 MBRC083 30 31 0.001
MBRC081 31 32 -0.001 MBRC082 31 32 0.001 MBRC083 31 32 0.005
MBRC081 32 33 0.001 MBRC082 32 33 0.001 MBRC083 32 33 0.004
MBRC081 33 34 0.001 MBRC082 33 34 -0.001 MBRC083 33 34 0.11
MBRC081 34 35 -0.001 MBRC082 34 35 0.001 MBRC083 34 35 0.005
MBRC081 35 36 -0.001 MBRC082 35 36 -0.001 MBRC083 35 36 0.001
MBRC081 36 37 -0.001 MBRC082 36 37 0.001 MBRC083 36 37 -0.001
MBRC081 37 38 -0.001 MBRC082 37 38 0.001 MBRC083 37 38 0.008
MBRC081 38 39 -0.001 MBRC082 38 39 0.001 MBRC083 38 39 0.086
MBRC081 39 40 0.047 MBRC082 39 40 0.002 MBRC083 39 40 0.021
MBRC081 40 41 0.099 MBRC082 40 41 0.001 MBRC083 40 41 0.017
MBRC081 41 42 1.27 MBRC082 41 42 2.01 MBRC083 41 42 0.001
MBRC081 42 43 5.07 MBRC082 42 43 0.73 MBRC083 42 43 0.001
MBRC081 43 44 3.84 MBRC082 43 44 0.07 MBRC083 43 44 -0.001
MBRC081 44 45 0.14 MBRC082 44 45 1.56 MBRC083 44 45 0.001
MBRC081 45 46 0.017 MBRC082 45 46 0.62 MBRC083 45 46 0.001
MBRC081 46 47 0.016 MBRC082 46 47 0.033 MBRC083 46 47 0.003
MBRC081 47 48 0.016 MBRC082 47 48 0.025 MBRC083 47 48 0.008
MBRC081 48 49 0.002 MBRC082 48 49 0.092 MBRC083 48 49 0.005
MBRC081 49 50 0.002 MBRC082 49 50 0.053 MBRC083 49 50 0.75
MBRC081 50 51 0.002 MBRC082 50 51 0.066 MBRC083 50 51 0.12
MBRC081 51 52 0.001 MBRC082 51 52 0.012 MBRC083 51 52 0.044
MBRC081 52 53 0.001 MBRC082 52 53 0.009 MBRC083 52 53 0.015
MBRC081 53 54 0.001 MBRC082 53 54 0.005 MBRC083 53 54 0.06
MBRC081 54 55 0.004 MBRC082 54 55 0.015 MBRC083 54 55 0.023
MBRC081 55 56 -0.001 MBRC082 55 56 0.006 MBRC083 55 56 0.017
MBRC081 56 57 -0.001 MBRC082 56 57 0.032 MBRC083 56 57 0.094
MBRC081 57 58 0.001 MBRC082 57 58 0.002 MBRC083 57 58 0.142
MBRC081 58 59 -0.001 MBRC082 58 59 0.056 MBRC083 58 59 0.01
MBRC081 59 60 -0.001 MBRC082 59 60 0.039 MBRC083 59 60 0.006
MBRC081 60 61 0.001 MBRC082 60 61 0.003 MBRC083 60 61 -0.001
MBRC081 61 62 -0.001 MBRC082 61 62 0.001 MBRC083 61 62 -0.001
MBRC081 62 63 -0.001 MBRC082 62 63 0.001 MBRC083 62 63 0.01
MBRC081 63 64 0.001 MBRC082 63 64 -0.001 MBRC083 63 64 0.008
MBRC081 64 65 -0.001 MBRC082 64 65 0.001 MBRC083 64 65 0.082
MBRC081 65 66 -0.001 MBRC082 65 66 -0.001 MBRC083 65 66 0.024
MBRC081 66 67 -0.001 MBRC082 66 67 0.001 MBRC083 66 67 0.045
MBRC083 67 68 0.013
MBRC083 68 69 0.001
MBRC083 69 70 0.001
MBRC083 70 71 0.001
MBRC083 71 72 -0.001
MBRC083 72 73 0.001
MBRC083 73 74 0.016
MBRC083 74 75 0.001
MBRC083 75 76 0.001
MBRC083 76 77 0.001
MBRC083 77 78 0.001
MBRC083 78 79 0.001
ASX : KM1 Page 6 of 12
Kali Metals Limited 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Annexure C: JORC Code, 2012 Edition – Table 1
Section 1: Sampling Techniques and Data (Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling techniques · Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
Reverse circulation (RC) drilling in granitic and
quartz-rich outcrops. Aside from a few locations
with thin (<2m) sandy/alluvial locations, majority
of drilling has started in (albeit weathered)
bedrock units. Grussification of top several
metres of granite is common.
Entire length of drilling has been sampled and
analysed. The sampling practice is appropriate to
the generally extensive outcropping/sub-
cropping terrain and complies with industry best
practice.
· Include reference to measures taken to
ensure sample representativity and the
appropriate calibration of any measurement
tools or systems used.
The bulk RC sample material (typically 15-20kg)
arrives through the rods, hose and cyclone, and
80% captured in big plastic bags and 20% in pre-
numbered calico bags (typically 3-4kg material).
· Aspects of the determination of
mineralisation that are Material to the Public
Report.
Gold mineralisation at Project area is not visible.
The microscopy has shown that gold micro-flakes
(up to 0.2mm in size) are hosted in goethitic
remnants of pyrite. The individual cubic euhedral
x-suplhides are 1-10cm in size (and as such,
visible) and associated to quartz-potassic zones.
Mineralisation is spatially associated to certain
alteration mineral assemblages and rock
textures: pyritic quartz veining in strongly altered
(potassic and propylitic) granodiorite intrusive
within the adamellite gneiss.
· In cases where ‘industry standard’ work
has been done this would be relatively simple
(eg ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may
be required, such as where there is coarse
gold that has inherent sampling problems.
Unusual commodities or mineralisation types
(eg submarine nodules) may warrant
disclosure of detailed information.
Reverse circulation drilling was used to obtain 1m
samples from which 3-4kg was pulverised to
produce 50g charge for fire assay. Sampling to
date (drilling and rock-chip) suggest that majority
of positive results are fairly uniform (1-3g/t Au
average) and with low variability, with a relatively
small population of samples (<1%) showing
higher grades (>10g/t Au). Drilling results
generally confirm previous conclusions.
Drilling techniques · Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what
method, etc).
RC & DD drilling with multipurpose rig UDR650
with supported truck-mounted auxiliary booster
compressor, using 4.5” hammer and 6m rods or
PQ/HQ diameter coring. The mineralised zone
was right on surface and assumed flat to gently-
dipping, hence short vertical holes were used in
this initial “scout” drilling.
ASX : KM1 Page 7 of 12
Kali Metals Limited 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Drill sample recovery · Method of recording and assessing core
and chip sample recoveries and results
assessed.
All samples for mineralised intervals were
reported to be dry. Some minor ground water
ingress occurred rarely and overall, the water
did not interfere with drilling and samples were
collected dry. Sample recoveries were
acceptable. Some losses occurred in the first
metres, especially in sandy areas. Samples are
monitored for possible contamination during the
drilling process by Company geologists.
· Measures taken to maximise sample
recovery and ensure representative nature of
the samples.
Drilling is carried out high-angle to orthogonal to
the mineralisation to get representative samples
of the mineralisation. Standard practices for RC
drilling are used.
· Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
No relationship between recovery and grade
have been identified. This is not seen to be a
material risk with the drilling methods and
approach to sampling being undertaken.
Logging · Whether core and chip samples have
been geologically and geotechnically logged
to a level of detail to support appropriate
Mineral Resource estimation, mining studies
and metallurgical studies.
Geological logging was completed by qualified
geologist, to a level of detail to support potential
future metallurgical testwork, mineral resource
estimation and mining studies.
· Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
Logging is qualitative and records lithology,
grain size, texture, weathering, structure,
alteration, veining and sulphides. Chip trays are
subsequently photographed – furthermore, a
selection of RC chips from different lithologies
was sent for external petrological assessment.
· The total length and percentage of the
relevant intersections logged.
All holes were geologically logged in full.
Sub-sampling
techniques and sample
preparation
· If core, whether cut or sawn and whether
quarter, half or all core taken.
Drill core is sawn in half.
· If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
1m RC samples are split on cyclone (20% split).
No compositing. All samples are dry, and no
holes were terminated in mineralisation due to
ingress of ground water.
· For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
The sample preparation at the lab included: dry,
crush 70% to -2mm, pulverise 85% to -75um
and rotary split to produce 200g pulp for assays.
The sample preparation procedures carried out
are considered industry standard and
acceptable.
· Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
Sampling is supervised by a geologist and
sample recovery and moisture content noted. A
checklist to ensure ongoing checking for sample
sequence, quality and to avoid contamination
has been implemented. The geologist monitors
samples for contamination during drilling. Drill
crews are required to routinely clean the
ASX : KM1 Page 8 of 12
Kali Metals Limited 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
cyclone, typically after each rod.
· Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for instance
results for field duplicate/second-half
sampling.
Samples are inspected for contamination. The
RC cyclone is routinely cleaned after each rod.
RC field duplicates are produced systematically
during drilling. The duplicate samples are
collected directly from the second chute from the
on-rig cone splitter. Dupicates of diamond core
are achieved by quarter cutting fo diamond core.
· Whether sample sizes are appropriate to
the grain size of the material being sampled.
Sample sizes are considered appropriate to give
an indication of mineralisation. Once a
meaningful population of samples is collected per
sample domain an assessment will be made of
the appropriate weight and number of samples to
allow the classification of mineral resources.
Quality of assay data
and laboratory tests
· The nature, quality and appropriateness
of the assaying and laboratory procedures
used and whether the technique is considered
partial or total.
The samples were submitted to ALS Perth
(independent and internationally accredited
laboratory). Samples were analysed with method
Au-ICP22 (50g charge). Au-ICP22 is a code for
fire assay analysis of gold with an ICP-AES
finish, generally considered a total analysis
method. It involves a total 4-acid digest to
dissolve all elements, including gold, in the
sample, followed by ICP-AES analysis to
determine the gold content.
· For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model, reading
times, calibrations factors applied and their
derivation, etc.
No geophysical surveys or p-XRF analysis are
being reported herein.
· Nature of quality control procedures
adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether
acceptable levels of accuracy (ie lack of bias)
and precision have been established.
QAQC process consist of Company procedures,
prescribed style of sampling and use of control
samples, as well as the check of control sample
performance and reporting. Some 10% of control
samples were included, consisting relatively
evenly of high-grade standards, low grade
standards, blanks and field duplicates. The
control samples have performed well (most within
1STD, and only one standard outside 2STD but
outside the mineralised zone).
Verification of
sampling and assaying
· The verification of significant
intersections by either independent or
alternative company personnel.
All assays are reviewed by Kali Metals and
significant intercepts are calculated as using
0.5g/t Au cut-off grade and no internal waste. All
significant intercepts are checked by the
Competent Person. The competent person was
present at the rig during the duration of drilling
program, routinely inspecting safety, sampling
sequence, drilling methodology, handling of RC
chips, and overseeing the logging geologist and
ASX : KM1 Page 9 of 12
Kali Metals Limited 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
field assistants.
· The use of twinned holes. Several initial RC intercepts have been repeated
by diamond drilling – all diamond drilling results
are pending.
· Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic) protocols.
Drill hole logging is completed on FastGeo app
with built-in validation. Duplicated copies of the
database and drillhole data is routinely backed
up through cloud server backups. Logging of
key intersections has been reviewed by the
Competent Person.
· Discuss any adjustment to assay data. No assay data was adjusted.
Location of data points · Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
Drill hole collars are DGPS surveyed by an
external contractor surveyor, using S631 GNSS
Smart Antenna, RTK GPS with expected
accuracies +/- 8mm.
· Specification of the grid system used. Grid system used is GDA94/MGA50.
· Quality and adequacy of topographic
control.
An updated digital terrain model has been
generated from several UAV drone surveys
carried in the area in the previous 12 months.
This was then used to validate DGPS pick ups.
Data spacing and
distribution
· Data spacing for reporting of Exploration
Results.
Drillhole spacing and drilling angles were
appropriate for outcropping/shallow flat to gently
dipping mineralisation zone. Drillhole spacing
was typically 10-20m in the outcropping
mineralisation zone, and 20-40m further away
from the outcropping mineralisation. Drilling lines
were positioned at 20-50m distance based on
favourable topography for most pragmatic
program execution.
· Whether the data spacing and
distribution is sufficient to establish the degree
of geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
Drilling is on a spacing which is sufficient to test
the grade continuity of mineralisation for this
style of mineralisation. The current data set is
considered appropriate for use in a potential
future MRE estimation.
· Whether sample compositing has been
applied.
No sample compositing has been applied.
Orientation of data in
relation to geological
structure
· Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
Drilling is designed to be high-angle to
orthogonal to the dip of mineralisation in the
outcropping zone. The current program has
successfully achieved this.
· If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
The bulk of the intercepts appear to be high-
angle to orthogonal to the mineralisation +/- 10
degrees.
Assay intercepts are stated as down-hole
lengths.
ASX : KM1 Page 10 of 12
Kali Metals Limited 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Sample security · The measures taken to ensure sample
security.
Samples are collected in prenumbered calico
bags. The calico bags were grouped in
polyweave bags and zip-tied on site. The
polyweave bags were then grouped into bulka
bags on site, and bulka bags were tied onto
pallets and shipped from site to laboratory.
Audits or reviews · The results of any audits or reviews of
sampling techniques and data.
All QAQC data is reviewed to ensure quality of
assays.
Section 2: Reporting of Exploration Results (Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral tenement and
land tenure status
· Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as joint
ventures, partnerships, overriding royalties,
native title interests, historical sites, wilderness
or national park and environmental settings.
Please refer to Annexure A “Tenements” for
information on tenement portfolio. There are
currently no undisclosed agreements or material
issues with third parties. All Marble Bar Project
tenements are in good standing and are 100%
owned by the Company.
· The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a licence to operate
in the area.
There are no known impediments to operate on
the tenement holding. Heritage and
environmental surveys have been carried out
and cleared the priority areas for exploration.
Exploration done by
other parties
· Acknowledgment and appraisal of
exploration by other parties.
The wider Project area has been a subject to a
limited historical exploration, most
Share your feedback