Annual Report 30 June 2026
Released
Released
Announcement PDF
Limited
ACN 653 279 371
AND ITS CONTROLLED ENTITIES
ANNUAL REPORT
For the year ended
30 JUNE 2026
ANNUAL REPORT 2026 Page 1 of 78
CONTENTS
CORPORATE DIRECTORY ................................................................................................................................................... 2
CHAIRMAN’S LETTER........................................................................................................................................................... 3
DIRECTORS’ REPORT............................................................................................................................................................ 5
AUDITOR’S INDEPENDENT DECLARATION................................................................................................................37
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME
FOR THE YEAR ENDED 30 JUNE 2026..........................................................................................................................38
CONSOLIDATED STATEMENT OF FINANCIAL POSITION AS AT 30 JUNE 2026............................................39
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY FOR THE YEAR ENDED 30 JUNE 2026 ............40
CONSOLIDATED STATEMENT OF CASH FLOWS FOR THE YEAR ENDED 30 JUNE 2026 ........................... 41
NOTES TO THE FINANCIAL STATEMENTS..................................................................................................................42
CONSOLIDATED ENTITY STATEMENT AS AT 30 JUNE 2026.................................................................................61
DIRECTORS’ DECLARATION.............................................................................................................................................62
INDEPENDENT AUDITOR’S REPORT.............................................................................................................................63
CORPORATE GOVERNANCE STATEMENT..................................................................................................................67
ASX ADDITIONAL INFORMATION.................................................................................................................................68
ANNUAL REPORT 2026 Page 2 of 78
CORPORATE DIRECTORY
Directors
Luke Reinehr Non-Executive Chairman
Paul Adams Managing Director
Simon Coyle Non-Executive Director
CFO & COMPANY SECRETARY
Silfia Morton
REGISTERED OFFICE & PRINCIPAL PLACE OF BUSINESS
Ground Floor, 34 Colin Street
West Perth, WA 6005
Telephone: +61 (8) 6424 8880
Web: www.kalimetals.com.au
SHARE REGISTER
Automic Share Registry Services
Level 5, 191 St Georges Terrace
Perth WA 6000
AUDITOR
BDO Audit Pty Ltd
Level 9, Mia Yellagonga Tower 2
5 Spring Street
Perth, WA 6000
SECURITIES EXCHANGE LISTING
The Company is listed on the Australian Securities Exchange Ltd (ASX) and the Frankfurt Stock Exchange
(FSE).
ASX Code: KM1
FSE Code: 6OB
ANNUAL REPORT 2026 Page 3 of 78
CHAIRMAN’S LETTER
Dear Shareholders,
It is my pleasure to welcome you to Kali Metals’ (ASX: KM1) 2026 Annual Report and reflect on the strong
progress we have made and the positive outlook for the year ahead.
In the last 12 months, we have taken the Marble Bar Gold Project from an emerging priority within the Kali
portfolio to a significantly more advanced gold project. We have completed two phases of drilling, confirmed
shallow gold mineralisation across multiple prospects and built a growing pipeline of new targets.
It has been particularly pleasing to see Marble Bar advance beyond the initial Tiger, Sherman and Churchill
prospects. Drilling has strengthened our understanding of the mineralised system and confirmed the
potential for mineralisation to continue beyond the areas tested to date. Our maiden drilling program was
completed in December 2025, identifying shallow gold mineralisation from surface, with 60% of holes
intersecting gold mineralisation. This provided the confidence to move quickly into a larger Phase II program,
completed in the June quarter of 2026. Initial Phase II results at Tiger 2 confirmed the continuity and depth
potential of the system. Since the year end, exploration has demonstrated the gold potential at Marble Bar
extends well beyond the areas drilled to date. Four new prospects have been identified, Stug, Vickers,
Pershing and Chiha, with a rock-chip measuring 53.1 g/t Au from Stug highlighting the wide distribution of
surface gold mineralisation. The progress made at Marble Bar during the year has been substantial.
Exploration has advanced from our first drilling program into a broader gold project with confirmed
mineralisation, multiple prospects and expanding exploration pipeline.
During the year, we also strengthened our position in the eastern Pilbara through the acquisition of the
remaining 30% interest in the DOM’s Hill and Pear Creek Projects, giving Kali 100% ownership of these assets
and adding approximately 441km² to our gold exploration footprint. These projects bring a substantial body
of historical exploration data and numerous shallow gold targets. Our focus in now on applying the same
systematic exploration approach that has advanced Marble Bar to the broader Pilbara portfolio.
While gold has become the clear exploration priority for Kali, we continue to retain exposure to lithium and
critical minerals across our portfolio. At Higginsville, a major soil sampling program was completed to help
define priority drill targets as market conditions improve.
Our Southern Lachlan Fold Belt portfolio also has provided an encouraging addition to the exploration
pipeline. Since year end, activity at Mt Cudgewa has identified a tin-tungsten mineralised system, providing
another area of interest to follow-up in the year ahead.
This exposure to broader commodities provides flexibility and allows exploration expenditure towards the
areas where we believe it can generate the greatest value for shareholders.
The Company finished the financial year with $6.84 million in cash and no debt, following strong support
from investors during the year through a $7.0 million placement, providing us with the financial capacity to
continue advancing our exploration programs.
Looking ahead, our immediate priority is to continue on the exploration success at Marble Bar, with further
drilling aimed to extend known mineralisation and regional exploration advancing new targets towards drill
testing.
We will also continue work at DOM’s Hill and Pear creek as we build our broader Pilbara gold portfolio, while
progressing the most promising opportunities across our portfolio.
On behalf of the Board, I would like to acknowledge our entire team for their efforts throughout the year
and thank our shareholders for their continued support.
ANNUAL REPORT 2026 Page 4 of 78
We enter the new financial year well-funded, with an active exploration program and a clearer picture of the
gold potential of our Marble Bar Project. We look forward to keeping you updated in the year ahead.
Yours sincerely
Luke Reinehr
Non-Executive Chairman
ANNUAL REPORT 2026 Page 5 of 78
DIRECTORS’ REPORT
The Directors present their report, together with the financial statements, on Kali Metals Limited (“the
Company” or “the Group” or “Kali”) and the entities it controls for the year ended 30 June 2026.
DIRECTORS
The following persons were directors of the Company during the whole of the financial period and up to the
date of this report, unless noted otherwise:
Luke Reinehr Non-Executive Chairman (appointed 31 August 2021)
Paul Adams
Managing Director (commenced 01 July 2024, previously Non-Executive
Director appointed on 31 August 2021)
Graeme Sloan
Non-Executive Director (commenced 01 July 2024, previously Managing
Director appointed on 19 May 2023, resigned on 30 June 2026)
Simon Coyle Non-Executive Director (appointed 19 May 2023)
PRINCIPAL ACTIVITIES
The Group is a minerals exploration Group with a focus on lithium, gold, and other critical minerals. The Group has
rights to explore across three highly prospective lithium and gold regions, being the Pilbara region of Western
Australia, the Eastern Yilgarn region in Western Australia, and the Lachlan Fold Belt region across Victoria and New
South Wales. The lithium projects across these regions consist of:
a) Marble Bar Project
b) DOM’s Hill Project
c) Pear Creek Project
d) Higginsville Project
e) Jingellic Project
f) Tallangatta Project
OPERATING RESULTS
The loss of the Group after providing for income tax for the year ended 30 June 2026 was $1,745,793 (2025:
loss of $2,751,988).
REVIEW OF OPERATIONS
Executive Summary
Kali is an Australian resources company which successfully commenced trading on the Australian Securities
Exchange (ASX) on 8 January 2024. Kali Metals has a portfolio of gold and lithium projects in Western
Australia and tin and tantalum projects in New South Wales and Victoria (Figure 1).
The FY26 period saw the Company’s focus on advancing the Marble Bar Gold Project from an early-stage
exploration opportunity with field activity including two drilling campaigns, confirming shallow gold
mineralisation across the key Tiger, Sherman and Churchill prospects.
DIRECTORS’ REPORT (CONTINUED)
ANNUAL REPORT 2026 Page 6 of 78
Figure 1 - Kali’s portfolio of Australian assets
Kali Metals has a portfolio of gold and lithium exploration projects spanning Western Australia (WA), New
South Wales (NSW), and Victoria (VIC). Notable projects include:
1. Higginsville District, WA: Higginsville Lithium Project
2. Pilbara Projects, WA: DOM’s Hill, Pear Creek and Marble Bar Lithium and Gold Projects
3. Lachlan Fold Belt Project: Jingellic and Tallangatta Lithium Projects
Marble Bar Gold Project, Western Australia
The Marble Bar Gold Project is located in the eastern region of the Pilbara, approximately 10km east of the
Marble Bar town and ~10km north of the operating Klondyke Gold Project (Refer Figure 2). The Marble Bar
Gold Project covers 118km2
, with geology mostly comprising the Mount Edgar Granitic Complex.
DIRECTORS’ REPORT (CONTINUED)
ANNUAL REPORT 2026 Page 7 of 78
Figure 2 – Kali Metals’ Marble Bar Gold Project
Field mapping programs throughout 2025, identified a ~3km cumulative strike length of gold mineralisation
at surface across the Tiger, Churchill and Sherman Prospects at the Marble Bar Gold Project. The surface
mapping and rock-chip sampling confirmed widespread gold mineralisation associated with quartz veining
and alteration, returning average gold grades of approximately 2.2 g/t Au across the system, with individual
rock-chip results of up to 87.9 g/t Au recorded at the Sherman Prospect. These results defined a coherent
gold system and provided the technical basis to design a maiden drill program at Marble Bar.
Phase I Drilling
The Company completed its maiden drilling program at Marble Bar in December 2025, comprising 77
shallow reverse circulation (‘RC’) holes for 1,086m. The program successfully intersected gold mineralisation
across the project, with 46 of the 77 holes recording mineralised intercepts of at least 1m and providing
evidence of continuity below the surface mineralisation identified earlier. Drilling confirmed a north to north-
east dip to the vein and associated alteration.
DIRECTORS’ REPORT (CONTINUED)
ANNUAL REPORT 2026 Page 8 of 78
Significant intersections included:
Sherman
5m @ 2.3 g/t Au from surface (MBRC001)
4m @ 3.2 g/t Au from surface (MBRC003)
3m @ 1.9 g/t Au from 2m (MBRC011)
2m @ 3.8 g/t Au from surface (MBRC005)
1m @ 6.0 g/t Au from surface (MBRC008)
Tiger 2
4m @ 2.4 g/t Au from surface (MBRC057)
3m @ 2.4 g/t Au from surface (MBRC060)
3m @ 1.9 g/t Au from surface (MBRC072)
2m @ 4.1 g/t Au from 17m (MBRC077)
2m @ 4.0 g/t Au from 9m (MBRC070)
Churchill
4m @ 1.9 g/t Au from surface (MBRC038)
1m @ 4.6 g/t Au from 15m (MBRC036)
Tiger
4m @ 1.7 g/t Au from surface (MBRC0
Figure 3 - Cross-section A-A’ at Sherman, demonstrating surface and down dip mineralisation within potassic altered
granodiorite
DIRECTORS’ REPORT (CONTINUED)
ANNUAL REPORT 2026 Page 9 of 78
Phase II Drilling
Following the success of the maiden drilling program, a substantially larger Phase II drilling program was
completed during the Q4FY26. Phase II comprised 4,059m of RC drilling and 281.7m of diamond drilling,
designed to reduce drill spacing from ~200m down to 40m across Sherman, Churchill and Tiger prospects.
Initial results also confirmed the gold mineralisation continued down-dip at Tiger 2.
Significant results (using a 0.5g/t gold cut-off) included:
5m @ 1.0 g/t from 41m in Hole MBRC082
3m @ 3.6 g/t from 41m in hole MBRC081,
2m @ 1.6g/t from 29m in Hole MBRC079
2m @ 1.6 g/t from 29m in Hole MBRC080
3m @ 0.6 g/t from 34m
2.6m @ 10.8 g/t Au from 8.7m (MBDD004); and
1.8m @ 7.4 g/t Au from 0m (MBDD002)
Figure 4 - New down-dip RC drilling results at Tiger 2 Prospect, Marble Bar Gold Project
Mapping and Rock-Chip sampling
During the year, Kali continued regional exploration across the Marble Bar Project, with mapping and rock-
chip sampling undertaken to identify new gold prospects and extensions to the established Tiger, Churchill
and Sherman prospects.
Subsequent to year-end, results from the 48 samples, identified four new gold prospects, Stug, Vickers,
Pershing and Chiha.
DIRECTORS’ REPORT (CONTINUED)
ANNUAL REPORT 2026 Page 10 of 78
Figure 5 - Marble Bar Gold Project, with new prospects highlighted in red
Stug emerged as the highest-priority new prospect with mineralised quartz veining mapped over ~200m of
strike and a peak result of 53.1g/t Au. Further sampling also extended or identified additional mineralisation
around the existing Sherman, Churchill and Tiger 2 prospects.
Figure 6 - Stug Gold Prospect: geology and rock-chip samples
DIRECTORS’ REPORT (CONTINUED)
ANNUAL REPORT 2026 Page 11 of 78
These new prospects will be advanced through further geological mapping and sampling ahead of potential
drill testing.
Soil Sampling
A broader soil sampling program comprising 1,215 samples defined several coherent gold-in-soil anomalies
and significantly expanding the regional target pipeline.
The program identified a 6.5km east-west gold anomaly within E45/6430 and a 1.1km north-west extension
of the Tiger Gold Prospect into E45/6389. A further 1.1km north-south anomaly within E45/4700 has also
been prioritised for follow-up.
These new anomalies provide additional areas for mapping, rock-chip sampling and target generation as
Kali continues to assess the broader gold potential of Marble Bar.
Figure 7 - Marble Bar Project: soil sampling results (gold)
Outlook
The results from drilling and regional exploration during FY26, together with the new prospects and
anomalies identified subsequent to year-end, have significantly expanded Kali’s understanding of the Marble
Bar gold system. Further mapping, sampling and interpretation of the Phase II drilling results will be used to
refine targets for the next phase of drilling.
DIRECTORS’ REPORT (CONTINUED)
ANNUAL REPORT 2026 Page 12 of 78
DOM’s Hill and Pear Creek Projects, Western Australia
The broader Pilbara gold portfolio was expanded during the year, via the acquisition of SQM Australia’s
remaining 30% interest in the DOM’s Hill and Pear Creek Projects. The acquisition gives Kali 100% ownership
of DOM’s Hill and Pear Creek and provides the Company with a substantially expanded wholly owned gold
exploration footprint in the eastern Pilbara, complementing its ongoing exploration at Marble Bar.
Figure 8 - Geology of DOM’s Hill and Pear Creek Project areas with gold occurrences and prospect names
DOM’s Hill and Pear Creek
The DOM’s Hill Project consists of six Exploration Licences, located approximately 52km northwest of
Marble Bar in the eastern Pilbara region of WA. The tenement package has seen a number of previous
exploration campaigns, primarily targeting gold mineralisation centred in the central, west and eastern
regions of EL45/4772 and early-stage lithium exploration.
A review of historical exploration at DOM’s Hill identified multiple shallow, high-grade gold targets, with
previous drilling defining mineralisation along an approximately 1.8km north-east trending corridor.
Historical results include 18m @ 3.4g/t Au from 1m, including 5m @ 8.4g/t Au, and rock-chip results of
up to 70g/t Au. Mineralisation remains open along strike and at depth.
Immediate plans include the acquisition of a high resolution hyperspectral survey across our entire
Pilbara portfolio, including DOM’s Hill and Pear Creek, to enhance our ability to generate further
prospects for ground truthing with an view to mapping, sampling and ultimately, drill testing.
DIRECTORS’ REPORT (CONTINUED)
ANNUAL REPORT 2026 Page 13 of 78
Higginsville Lithium Project – Western Australia
The Higginsville Lithium Project covers ~1,571km², where Kali holds 100% of the lithium and battery mineral
rights, in a region well-endowed with LCT pegmatites, with two producing lithium mines Mt Marion and Bald
Hill and three advanced prospects in Manna, Buldania and Dome North.
Within this portfolio, eight projects have been identified with prospective geological settings for LCT
pegmatites. Several areas already contain mapped outcropping pegmatites with spodumene confirmed,
while others have pegmatite occurrences logged through historic core reviews.
Figure 9 – Kali Metals’ Higginsville Lithium Project
DIRECTORS’ REPORT (CONTINUED)
ANNUAL REPORT 2026 Page 14 of 78
During the year, Kali completed an extensive soil sampling program across the Higginsville Lithium Project,
collecting 13,326 samples across priority areas including Spargoville, Widgiemooltha, Higginsville Central,
Chalice, Golden Lake, Buldania and the Mt Henry–Norseman region. The program integrated geophysical
and geochemical datasets with geological modelling to assess areas prospective for LCT pegmatite
mineralisation. Post-reporting period, geological mapping at Widgiemooltha has identified several
spodumene-bearing pegmatites trending east-west, with rock chip samples returning up to 2.1% LiO2; the
detailed observations will be provided in the next Annual Report.
Figure 10 – Higginsville Lithium Project soils program locations
Outlook
Results from the soil sampling program will be integrated with the existing geological dataset to refine and
rank priority lithium targets ahead of future drill testing.
DIRECTORS’ REPORT (CONTINUED)
ANNUAL REPORT 2026 Page 15 of 78
Southern Lachlan Fold Belt – NSW and Victoria
During the year, there was limited exploration across Kali’s Lachlan Fold Belt Projects. The Jingellic and
Tallangatta Projects are prospective for tungsten, tin, tantalum, niobium and lithium. (see Figure 11)
Figure 11 - Southern Lachlan Fold Belt – Kali’s Tallangatta (VIC) and Jingellic (NSW) Projects
DIRECTORS’ REPORT (CONTINUED)
ANNUAL REPORT 2026 Page 16 of 78
Tallangatta Project (Victoria)
The Tallangatta Project, located in Victoria, hosts two prospective areas, Mt Cudgewa and Milden.
Subsequent to year-end, mapping and sampling across the Mt Cudgewa area identified a hard-rock tin-
tungsten mineralised system approximately 200m south of the historical Cudgewa alluvial tin workings. The
mineralised zone extends for approximately 1.7km and is up to 250m wide, comprising multiple zones of
quartz veining.
Rock-chip sampling returned high-grade tin with associated tungsten, including results of up to 6.00% SnO₂
and 0.38% WO₃. Soil sampling across the broader area also identified tin and tungsten anomalism over
known occurrences and potential extensions to the mineralised system, as well as additional anomalies to
the south and west.
Figure 7 - Mt Cudgewa Prospect – Geology map showing tin rock-chip sampling (labelled tin results in percentages) and soil
sampling results
A broader soil sampling program was also undertaken, consisting of 880 samples across Mt Cudgewa. Initial
results from 480 samples, defined tin and tungsten anomalism associated with known mineralisation and
indicated potential extensions, particularly to the east. A sub-parallel tin anomaly has also been identified
approximately 500m south of Mt Cudgewa, while broad tin anomalies over granitoids to the west are
interpreted as a potential source of the Mt Cudgewa mineralisation.
DIRECTORS’ REPORT (CONTINUED)
ANNUAL REPORT 2026 Page 17 of 78
Reconnaissance sampling at the nearby Mildren Prospect also returned anomalous tungsten results, with
two of three rock-chip samples returning grades above 0.1% WO3.
Further soil sampling and follow-up exploration are planned to better define the extent of mineralisation
and prioritise areas for subsequent exploration.
Figure 8 - Geology plan map showing soil sampling status and soil sampling results received (tin)
Future exploration activity at Tallangatta Project may include further mapping and rock-chip sampling and
additional LiDAR imagery acquisition, coinciding with plans for drilling approvals.
Jingellic Project (NSW)
No exploration activity was undertaken across the Jingellic Project during the reporting period.
Corporate
Capital Raising
During the year, Kali undertook two placements, a $1.2 million placement in August 2025 and $7.0 million
placement in February 2026, details are outlined below.
The $1.2 million Placement consisted of issuance of 8,660,000 new shares at $0.14 per new share
The two-tranche $7.0m (before costs) consisted of Tranche 1 issuance of 38,472,222 new ordinary
shares at an issue price of $0.18 per New Share. Kali’s Directors subscribed for a total of 527,779 New
Shares for $95,000 in Tranche 2 of the Placement, which was issued following shareholder approval.
DIRECTORS’ REPORT (CONTINUED)
ANNUAL REPORT 2026 Page 18 of 78
Board Changes
During the year, Non-Executive Director Graeme Sloan resigned from the Board, effective 30 June 2026,
after playing a key role in the establishment of Kali Metals, its successful ASX listing and subsequent
growth.
Appointments
Mrs Silfia Morton was appointed as Company Secretary, in addition to her role as Kali Chief Financial Officer.
Mrs Morton replaced Mr Nicholas Madders who resigned from the Company effective from 1 August 2025.
Annual General Meeting
Kali held its Annual General Meeting on 12 November 2025. All resolutions were carried.
Outlook for Financial Year 2027
During the 2027 financial year, Kali Metals Limited will continue to focus on advancing its portfolio of highly
prospective gold, lithium and critical minerals projects across Western Australia, while maintaining a
disciplined approach to exploration expenditure and capital management.
Following the capital raisings completed during FY2026, the Company enters FY2027 with an enhanced
funding position to progress targeted exploration programs across its key projects.
At the Marble Bar Gold Project, the Company intends to continue systematic exploration aimed at defining
and advancing priority gold targets. Planned activities are expected to include further geological
interpretation, target generation and drilling of priority prospects, together with follow-up work on areas
where previous exploration has identified encouraging gold mineralisation. The Company’s objective is to
progressively improve its understanding of the broader mineralised system and identify opportunities
capable of supporting future resource definition.
At the Higginsville Lithium Project, Kali intends to continue advancing exploration across its substantial
tenure position within the Higginsville Lithium District. Activities during FY2027 are expected to focus on
refining priority lithium targets through geological mapping, geochemical programs, geophysical
interpretation and targeted drilling where warranted. The Company will continue to assess the potential of
its extensive pegmatite systems and prioritise exploration expenditure toward areas considered to have the
greatest potential to deliver material discoveries.
Following the acquisition of the remaining interest in the DOM’s Hill and Pear Creek Projects during FY2026,
Kali now has greater flexibility in determining the future exploration, development and commercialisation
strategy for these projects. During FY2027, the Company will continue to assess exploration priorities and
strategic opportunities across these wholly owned assets as part of its broader Pilbara portfolio.
Across the broader portfolio, including the Southern Lachlan Fold Belt, the Company will continue to review
exploration results, tenure and expenditure priorities and will allocate capital to those opportunities
considered most capable of creating shareholder value.
Kali will also continue to assess potential strategic transactions, partnerships and new project opportunities
that complement its existing portfolio.
The Company remains committed to maintaining a strong focus on exploration discipline, efficient allocation
of capital and the advancement of projects capable of delivering material discoveries and long-term value
for shareholders.
DIRECTORS’ REPORT (CONTINUED)
ANNUAL REPORT 2026 Page 19 of 78
Competent Person Statement
The information in this report that relates to Data and Exploration Results is based on and fairly represents
information and supporting documentation compiled and reviewed by Mr Mladen Stevanovic a Competent
Person who is a Member of the AusIMM (membership number 333579) and Exploration Manager at Kali
Metals. Mr Stevanovic has sufficient experience relevant to the style of mineralisation and type of deposit
under consideration and to the activity which he has undertaken to qualify as a Competent Person as defined
in the 2012 Edition of the ‘Australasian Code for the Reporting of Exploration Results, Mineral Resources and
Ore Reserves’. Mr Stevanovic consents to the inclusion in the report of the matters based on his information
in the form and context in which it appears.
Forward Statements
This report may include forward-looking statements. Forward-looking statements include, but are not limited
to, statements concerning Kali’s planned exploration program and other statements that are not historical
facts. When used in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may”,
"potential", "should," and similar expressions are forward-looking statements. Although Kali believes that its
expectations reflected in these forward-looking statements are reasonable, such statements involve risks and
uncertainties and no assurance can be given that actual results will be consistent with these forward-looking
statements.
Previously Reported Results
The information in this announcement that relates to previously reported Exploration Results was previously
announced in Kali’s ASX announcements as summarised in the below table. Kali confirms that it is not aware
of any new information or data that materially affects the information included in the original
announcements.
Date Announcement Headline
22-Jul-25 Exciting New High-Grade Prospect Identified at Marble Bar
25-Jul-25 Quarterly Activities/Appendix 5B Cash Flow Report
4-Aug-25 Diggers and Dealers Presentation
4-Aug-25 Soil Sampling Recommences at Higginsville Lithium Project
8-Aug-25 Change of Company Secretary
21-Aug-25 Kali Raises $1.2 Million via Placement
26-Aug-25 Completion of Placement and Cleansing Notice
19-Sep-25 Corporate Governance Statement and Appendix 4G
19-Sep-25 Annual Report
13-Oct-25 Letter to Shareholders
13-Oct-25 Notice of Annual General Meeting & Proxy Form
21-Oct-25 Exploration Update at Higginsville and Marble Bar Projects
22-Oct-25 Quarterly Activities/ Appendix 5B Cash Flow Report
12-Nov-25 AGM Investor Presentation
28-Nov-25 Drilling Commenced at Marble Bar Gold Project
17-Dec-25 2025 Exploration Programs Completed
22-Jan-26 Quarterly Activities / Appendix 5B Cash Flow Report
29-Jan-26 High Grade Gold Results From Maiden Marble Bar Drill Program
6-Feb-26 $7m Placement to Advance Marble Bar Gold Project
17-Feb-26 Completion of Tranche 1 Placement and Cleansing Notice
25-Feb-26 Consolidation of Kali's Pilbara Assets
DIRECTORS’ REPORT (CONTINUED)
ANNUAL REPORT 2026 Page 20 of 78
Date Announcement Headline
27-Feb-26 Letter to Shareholders
9-Mar-26 Half Year Financial Report 31 December 2025
10-Mar-26 Cleansing Notice under s708A(5)(e) of the Corporations Act
30-Mar-26 Shallow High-Grade Gold Targets at DOM's Hill
31-Mar-26 Results of General Meeting
7-Apr-26 Completion of Tranche 2 Placement and Cleansing Notice
16-Apr-26 Phase II Drilling Commences at Marble Bar
21-Apr-26 Quarterly Activities / Appendix 5B Cash Flow Report
5-May-26 Investor Presentation - RIU Sydney Resources Round-Up
24-Jun-26 Phase II Drilling Confirms Down Dip Extensions at Marble Bar
30-Jun-26 Non-Executive Director Resignation
21-Jul-26 New High-Grade Gold Prospects Identified at Marble Bar
27-Jul-26 Quarterly Activities / Appendix 5B Cash Flow Report
3-Aug-26 High-Grade Tin and Tungsten Mineralisation at Mt Cudgewa
9-Sep-26 High-Grade Gold in Phase 2 Drilling at Marble Bar Discovery
FINANCIAL
As at 30 June 2026, the Group had net assets of $27,287,866 (2025: $21,000,486) including cash and cash
equivalents and short-term deposits of $6,726,942 (2025: $4,838,125) and capitalised exploration and
evaluation assets of $21,229,295 (2025: $16,075,697).
SIGNIFICANT CHANGES IN THE STATE OF AFFAIRS
In August 2025, the Company completed a placement to sophisticated and institutional investors, raising
approximately $1.2 million before costs through the issue of 8,660,000 fully paid ordinary shares at an issue
price of $0.14 per share. The capital raising strengthened the Company’s cash position and provided
additional funding to support ongoing exploration activities across its project portfolio and for general
working capital purposes.
In February 2026, the Company announced a further $7.0 million capital raising through the issue of
approximately 39 million fully paid ordinary shares at an issue price of $0.