HALF-YEAR FINANCIAL REPORT
For the period ended
31 DECEMBER 2024
CONTENTS
CORPORATE DIRECTORY ................................................................................................................................................... 2
DIRECTORS’ REPORT ............................................................................................................................................................ 3
AUDITOR’S INDEPENDENCE DECLARATION .............................................................................................................. 13
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME FOR THE
HALF-YEAR ENDED 31 DECEMBER 2024 ......................................................................................................................14
CONSOLIDATED STATEMENT OF FINANCIAL POSITION AS AT 31 DECEMBER 2024 .................................. 15
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY FOR THE HALF-YEAR ENDED 31 DECEMBER
2024 .......................................................................................................................................................................................... 16
CONSOLIDATED STATEMENT OF CASH FLOWS FOR THE HALF-YEAR ENDED 31 DECEMBER 2024 .... 17
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE HALF-YEAR ENDED
31 DECEMBER 2024 ............................................................................................................................................................. 18
DIRECTORS’ DECLARATION............................................................................................................................................. 26
INDEPENDENT AUDITOR’S REVIEW REPORT .......................................................................................................... ..27
HALF-YEAR FINANCIAL REPORT 31 DECEMBER 2024
Page 1 of 28
CORPORATE DIRECTORY
DIRECTORS
Luke Reinehr
Paul Adams
Graeme Sloan
Simon Coyle
Non-Executive Chairman
Managing Director
Non-Executive Director
Non-Executive Director
CHIEF FINANCIAL OFFICER
Silfia Morton
COMPANY SECRETARY
Nicholas Madders
REGISTERED OFFICE & PRINCIPAL PLACE OF BUSINESS
Level 1, 34 Colin Street
West Perth, WA 6005
Telephone: +61 (8) 6424 8880
Web: www.kalimetals.com.au
AUDITOR
BDO Audit Pty Ltd
Level 9, Mia Yellagonga Tower 2
5 Spring Street
Perth, WA 6000
LEGAL
Hamilton Locke
Level 48, 152-158 St Georges Terrace,
Perth, WA 6000
SHARE REGISTER
Automic Share Registry Services
Level 5, 191 St Georges Terrace
Perth WA 6000
SECURITIES EXCHANGE LISTING
The Company is listed on the Australian Securities Exchange Ltd (ASX) and the Frankfurt Stock Exchange
(FSE).
ASX Code: KM1
FSE Code: 6OB
HALF-YEAR FINANCIAL REPORT 31 DECEMBER 2024
Page 2 of 28
DIRECTORS’ REPORT
The Directors of Kali Metals Limited (“Kali” or “the Company” or “the Group”) submit the consolidated
financial report for the Group for the half-year ended 31 December 2024. The Group was incorporated on
31 August 2021 and was a wholly owned subsidiary of Kalamazoo Resources Limited (“Kalamazoo”). On 29
December 2023, the Group demerged from Kalamazoo following the issue of shares for the acquisition of
various mining assets.
DIRECTORS
The names of Directors who held office during or since the end of the half year and until the date of this
report are noted below. Directors were in office for this entire period unless otherwise stated.
•
•
•
•
•
Luke Reinehr
Paul Adams
Graeme Sloan
John Leddy (resigned on 30 September 2024)
Simon Coyle
REVIEW OF OPERATIONS
Kali is a minerals exploration Group with a focus on lithium, gold, tin and critical minerals. The Company
maintains a portfolio of assets that represents one of the largest and most prospective exploration packages
across the Higginsville Lithium District and the Pilbara in Western Australia and the Southern Lachlan Fold
Belt in New South Wales and Victoria.
The Company’s portfolio of assets includes:
•
•
•
Pilbara Projects
o DOM’s Hill Project
o Marble Bar Project
o Pear Creek Project
Southern Lachlan Fold Belt Projects
o Jingellic Project
o Tallangatta Project
Higginsville Lithium District
Kali’s ~3,960 km2 exploration tenure is located near existing, emerging and unexplored lithium, gold, tin and
critical minerals regions.
HALF-YEAR FINANCIAL REPORT 31 DECEMBER 2024
Page 3 of 28
Figure 1: Kali Metals Portfolio
Key activities carried out by Kali through this reporting period include:
•
•
•
•
•
Expansion of its Earn-In Agreement (“JV”) with SQM Australia Pty Ltd (“SQM Australia”) at DOM’s
Hill and Pear Creek in the Pilbara
Mapping and sampling programs at its 100%-owned Marble Bar Project, in the Pilbara
Mapping and rock chip sampling program at the Jingellic Project in New South Wales
Geophysical review of the Higginsville Project with a view towards target generation
3-D modelling, mapping and sampling programs at the Higginsville Project.
Pilbara Projects
Expansion of SQM Joint Venture
Previously, all of Kali’s Pilbara Projects were subject to the JV with SQM Australia (“JV or SQM JV”), however
during the Reporting Period Kali expanded and amended the terms of the JV as follows:
•
•
•
•
Kali incorporated three new tenements into the JV, acquired from major shareholder Kalamazoo
SQM Australia agreed to spend a minimum of $500,000 on exploration by 15 December 2025 to
retain its 30% interest in Kali’s DOM’s Hill and Pear Creek tenements
SQM Australia committed to an additional $1,000,000 of expenditure, now $4,250,000 by 15
December 2026, to earn a 50% interest in the expanded JV tenements
Kali retained 100% ownership of its Marble Bar Project, which has subsequently demonstrated
positive gold potential in addition to the existing lithium prospectivity. These tenements are no
longer covered by the JV.
Following the acquisition and subsequent incorporation of the three new tenements into the JV, the
Company’s Pilbara landholding increased by ~129km2.
HALF-YEAR FINANCIAL REPORT 31 DECEMBER 2024
Page 4 of 28
Figure 2: Kali Metals Pilbara Tenure
Marble Bar Project
Kali’s Marble Bar Project which was previously part of the SQM JV, is located in the eastern Pilbara,
approximately 30km east of the town of Marble Bar. Covering 42km2, the project geology comprises the
Mount Edgar Granitic Complex and Warrawoona Greenstone Belt (sedimentary and volcanic rocks).
Following the amendments to the JV (refer above), Kali maintains 100% interest in the Marble Bar Project.
From activity carried out by previous explorers 1, the Marble Bar region is considered prospective for both
lithium and gold. Encouraged by the presence of the nearby delineated lithium and gold deposits, the
Company carried out reconnaissance over the Marble Bar Project area, targeting LCT pegmatites for lithium
potential and quartz veining for gold potential.
0F
New Gold Anomaly Discovered
In September 2024, Kali completed a reconnaissance mapping and sampling program over the Marble Bar
Project area, which targeted both LCT pegmatites and quartz veining. Initial areas of gold focus included the
Tiger and Sherman Prospects.
Simultaneously, Kali identified from historical soil sampling results (conducted in late 2021 by Kalamazoo) a
cumulative, coherent, 5.1km long WNW striking gold-in-soil anomaly, interpreted to be bisected by several
off-setting, north-east striking structures.
1
Refer KRZ ASX announcement “High Priority Gold Anomaly defined at Marble Bar” dated 9 October 2019.
HALF-YEAR FINANCIAL REPORT 31 DECEMBER 2024
Page 5 of 28
In December 2024, the Company submitted ~600 historical soil samples not previously assayed for gold.
Post Reporting Period end, Kali advised that through the results of these further soil samples 2, the gold-insoil anomaly had increased by 80% to a 9.5 km cumulative, coherent strike length.
1F
The mineralised structures at both the Sherman and Tiger Prospects are dominated by WNW trending quartz
veins in the same orientation as the gold-in-soil anomalies. The Tiger Prospect also contains a second set of
mineralised quartz veins trending N to NE.
Rock Chip Sampling Results
Assays from the Company’s rock-chip sampling programs identified gold mineralisation on surface and
confirmed significant lithium potential. The standout results returned from the areas explored include 3:
2F
Tiger Gold Prospect
•
Rock chips up to 3.0g/t gold from multiple outcropping steeply dipping quartz veins (up to 5m
wide in outcrop) in monzogranite over a 400x400m area
Sherman Gold Prospect
•
Seven rock-chip samples collected during November from the Sherman Prospect, with best
results up to 4 g/t gold returned from a quartz vein measuring 120m in length and up to 7m in
width
Panther Lithium Prospect
•
Up to 1.5% Li2O in rock chip samples from a LCT pegmatite, locally up to 15-20m wide in outcrop
(assumed >10m true width), with multiple >1% Li2O outcrop samples over the 1.1km strike length
Heritage Surveys
The Company advised that Aboriginal heritage surveys over four emerging gold prospects at Marble Bar
Project were completed during November 2024.
Southern Lachlan Fold Belt Projects
Kali’s Southern Lachlan Fold Belt Projects comprise the Jingellic Project in NSW, covering approximately
1,220km2 (tenements EL9403, EL9507 and EL8958 4) and the Tallangatta Project in Victoria, a greenfields
exploration project covering 839km2.
3F
2
Refer KM1 ASX announcement dated 21 January 2025
Refer KM1 Announcement dated 11 December 2024.
4
Kali holds the tin-tungsten and lithium-caesium-tantalum rights as defined in the NSW Mining Act 1992
3
HALF-YEAR FINANCIAL REPORT 31 DECEMBER 2024
Page 6 of 28
Figure 3: Kali Metals Southern Lachlan Fold Belt Projects
Jingellic Project
At Jingellic, Kali’s initial exploration focus has been on EL9403 and the highly prospective Sweetwater area
which contains several historic tin mines and the recently identified lithium-bearing pegmatites 5.
4F
The main tin mines around Sweetwater include the Mullengandra, McLurg’s and Parsons-Hunter mines (as
well as dozens of smaller workings) which were active in the early 1900s. Tin mineralisation is associated with
the mineral cassiterite (the main economic tin mineral). A historical data review carried out by Kali 6 revealed
the high-grade tin-bearing workings also contain significant amounts of tantalum and niobium, adding to
the potential prospectivity of the area.
5F
The Sweetwater area also hosts notable LCT pegmatites, with the two most prominent pegmatites identified
to date being the Giant Pegmatite and the BFG Pegmatite. Results from rock chip sampling carried out by
Kali at the Giant Pegmatite confirmed LCT-type mineralisation ranging from 0.66% to 1.54% Li2O 7. The BFG
pegmatite composed of two dykes over 1km cumulative length, identified from LiDAR imagery.
6F
5
KM1 ASX Announcement 28 June 2024
KM1 ASX Announcement 28 June 2024
7
KM1 ASX Announcement 28 June 2024.
6
HALF-YEAR FINANCIAL REPORT 31 DECEMBER 2024
Page 7 of 28
A LiDAR survey undertaken in February 2024 assisted in identifying the long-forgotten historical tin workings
and a soil sampling program (Q3 2024) resulted in several km-scale tin, tungsten, tantalum and lithium
anomalies 8.
7F
Figure 4: Sweetwater Area Location Map and Soil Sampling Program
Soil Sampling Program
In July 2024, Kali completed its initial soil sampling program consisting of 597 samples collected over an area
of 13.7km2, on a 150x150m grid. . Results from this program confirmed the geochemical anomalies in lithium,
tin, tungsten and tantalum over the known occurrences and identified NW-SE striking extensions of these
anomalies that remain open to NW and SE. In addition, the soil sampling has identified previously unknown
areas of anomalism that require follow up.
Rock Chip Sampling Results
In Q3 2024, Kali initiated geological mapping of these areas and to date has collected a total of 35 rock chip
samples. Prior to the end of the Reporting Period, five high-grade samples were returned of > 1% SnO2 (up
to an exceptional 7.99% SnO2) and seven lower grade samples between 0.1% and 1.0% tin-oxide, all
accompanied with encouraging tantalum and niobium levels 9.
8F
8
9
KM1 ASX Announcement 10 September 2024
KM1 ASX Announcement 4 December 2024.
HALF-YEAR FINANCIAL REPORT 31 DECEMBER 2024
Page 8 of 28
The results of a further 14 samples were reported Post Quarter delivering 11 high-grade samples of > 1%
SnO2 (best 16.7% SnO2) and 3 lower grade samples between 0.18% and 1.0% SnO2, often accompanied with
notable tantalum and niobium results.
Further Activities
In addition to the above activities Kali has also carried out the following activities:
•
•
•
•
•
Infill soil sampling was completed to further constrain the soil anomalies over the identified
anomalous trends. 287 samples have been collected, with all results still pending (likely to be
reported during Q1 2025). The soil sampling consisted of 150x150m infill and orientation surveys
(10m spacing) over the Giant Pegmatite, and historical workings at Mullengandra and McLurg’s.
Rock petrography conducted by tin expert Dr Roger G. Taylor has been completed. The main
minerals of interest (cassiterite and spodumene) were confirmed in thin sections. The report
findings were integrated into the ongoing geological mapping campaign.
Literature review and desktop studies for regional tin (and lithium) prospectivity have been
completed. Review of the desktop study is ongoing.
Given the success of using LiDAR over the Sweetwater area, Kali has engaged GeoCloud
Analytics and MNG Survey to complete a 50km2 data acquisition (and data
processing/interpretation) for Mt Cudgewa prospect on EL7786 at the Tallangata Project (VIC).
The Mt Cudgewa Prospect hosts known hard rock tin prospects and known pegmatite
occurrences, on hilly Crown land not under license by private or corporate entities.
Designing the soil sampling grid expansion into the eastern EL9507 Woomargama State
Conservation Area (access now granted) is ongoing. This plan will await the LiDAR data
acquisition over Mt Cudgewa and propose a soil sampling program over both EL9507 and
EL7786 tenements.
Higginsville Lithium District
The Higginsville Lithium District covers approximately 1,571km2 of land holding with Kali owning 100% of the
lithium and associated battery mineral rights across these tenements.
Eight projects within the Higginsville Lithium District portfolio have been identified as having a prospective
geological setting to host LCT pegmatites. Some of these areas have existing mapped outcropping
pegmatites with Spodumene identified, while in other areas, pegmatite occurrences have been logged as
part of the historic core review program.
Historical Data Review
During the Reporting Period Kali commenced its work program at Higginsville with a review of historical drill
data from Westgold Resources Limited’s (“ASX: WGX”) (“Westgold”). Whilst numerous pegmatites had been
intersected in previous drilling, little was known about their mineralogy or geochemistry. Prior to the review,
the majority of the pegmatites had never been logged for mineralogy nor considered for their lithium
potential.
Preliminary findings of the review, which focused on the area around Westgold’s Spargo’s Reward open pit
gold mine, revealed multiple spodumene occurrences at the Spargoville Project 10. The identification and
logging of the remaining core containing pegmatites close to the Spargo’s Reward open pit has resulted in
new target areas for Kali.
9F
10
KM1 ASX Announcement dated 6 August 2024
HALF-YEAR FINANCIAL REPORT 31 DECEMBER 2024
Page 9 of 28
Figure 5: Higginsville Lithium District
Drilling
Early in the Reporting Period the Company announced positive results from the Phase 1 drilling program at
Spargoville. This maiden drill program was fundamental in expanding the Company’s knowledge of the
geological setting at the Flynn-Giles and Green Flame prospects, and the Spargoville Project more broadly.
Kali completed its initial reverse circulation (“RC”) drilling program at the Spargoville Project which returned
key intercepts of:
•
•
9m @ 1.11% Li2O, including 5m at 1.73% Li2O: 24SPRC006
10m @ 0.85% Li2O, including 4m at 1.96% Li2O: 24SPRC003
RC drilling completed at the Widgiemooltha Project returned significant results including:
•
•
•
10m @ 1.06% Li2O from 43m in hole 24WDRC002 (not true width)
2m @ 0.95% Li2O from 99m in hole 24WDRC004
1m @ 1.44% Li2O from 27m in hole 24WDRC010
The first phase of RC drilling provided the Company with significant information to assist in understanding
the geology of the host rocks, the nature of the pegmatite systems within the Spargoville Project and
facilitate the identification of targets for future drilling programs.
HALF-YEAR FINANCIAL REPORT 31 DECEMBER 2024
Page 10 of 28
This first pass drill program at Widgiemooltha intersected a series of sub-parallel, steeply west-dipping LCT
pegmatites hosted within a mafic sequence (with minor felsic units), in close proximity to a felsic sequence
to the West. The host lithium mineral is spodumene. Drilling was conducted at approximately 120m line
spacing by 40m spacing along lines. The two northern sections are 320m apart due to topography
constraints.
Figure 6: Widgiemooltha Lithium Project Location map, pegmatite trends and significant intersections
HALF-YEAR FINANCIAL REPORT 31 DECEMBER 2024
Page 11 of 28
Looking Ahead
Following the historical review and results from the Phase 1 drill program, Kali’s attention at Higginsville has
been focused on reconnaissance, mapping, continued 3-D modelling of pegmatites and a comprehensive
geophysical survey review of the entire project area, with a view towards target generation and drilling of
the highest ranked targets in 2025.
OPERATING RESULT
The Group’s loss for the half-year ended 31 December 2024 after providing for income tax amounted to
$1,653,283 (31 December 2023, profit of $286,313).
MATTERS SUBSEQUENT TO THE END OF THE FINANCIAL PERIOD
No matter or circumstance has arisen since 31 December 2024 that has significantly affected, or may
significantly affect the Group’s operations, the results of those operations, or the Group’s state of affairs in
future financial periods.
AUDITOR’S INDEPENDENCE DECLARATION
A copy of the auditor’s independence declaration as required under s307C of the Corporations Act 2001 is
set out immediately after this Directors’ Report.
This report is made in accordance with a resolution of the Directors.
Paul Adams
Managing Director
5 March 2025
HALF-YEAR FINANCIAL REPORT 31 DECEMBER 2024
Page 12 of 28
Tel: +61 8 6382 4600
Fax: +61 8 6382 4601
www.bdo.com.au
Level 9, Mia Yellagonga Tower 2
5 Spring Street
Perth, WA 6000
PO Box 700 West Perth WA 6872
Australia
DECLARATION OF INDEPENDENCE BY GLYN O'BRIEN TO THE DIRECTORS OF KALI METALS LIMITED
As lead auditor for the review of Kali Metals Limited for the half-year ended 31 December 2024,
I declare that, to the best of my knowledge and belief, there have been:
1.
No contraventions of the auditor independence requirements of the Corporations Act 2001 in
relation to the review; and
2.
No contraventions of any applicable code of professional conduct in relation to the review.
This declaration is in respect of Kali Metals Limited and the entities it controlled during the period.
Glyn O’Brien
Director
BDO Audit Pty Ltd
Perth
5 March 2025
BDO Audit Pty Ltd ABN 33 134 022 870 is a member of a national association of independent entities which are all members of A.C.N. 050 110 275 Ltd ABN 77 050 110 275,
an Australian company limited by guarantee. BDO Audit Pty Ltd and A.C.N. 050 110 275 Ltd are members of BDO International Ltd, a UK company limited by guarantee, and
form part of the international BDO network of independent member firms. Liability limited by a scheme approved under Professional Standards Legislation
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER
COMPREHENSIVE INCOME FOR THE HALF-YEAR ENDED
31 DECEMBER 2024
Revenue
Other income
Interest Income
Gain on loan forgiven
Expenses
Employee benefits expense
Share based payments
Compliance costs
Legal costs
Marketing and investor relation expenses
Travel costs
Exploration evaluation expenditures
Depreciation expenses
Other expenses
Profit / (Loss) from continuing operations before
income tax
Income expense
Profit/(Loss) after income tax attributable to the
owners of Kali Metals Limited
Other comprehensive income/(loss)
Items that will not be reclassified to profit or loss
Items that may be reclassified subsequently to profit or loss
Other comprehensive income, net of tax
Total comprehensive profit/(loss) for the period
attributable to the owners of Kali Metals Limited
Profit/(Loss) per share from continuing operations
attributable to the ordinary equity holders of Kali
Metals Limited:
Basic and diluted profit/(loss) per share (cents)
Notes
9
3
10
Half-year ended
31 Dec 2024
$
Half-year ended
31 Dec 2023
$
35,073
182,498
-
25,376
1,514,724
(461,846)
(748,109)
(309,330)
(43,192)
(25,352)
(37,431)
(981)
(79,974)
(164,639)
(333,436)
(389,493)
(411,965)
31,840
(53,946)
(28,414)
(274)
(68,099)
(1,653,283)
-
286,313
-
(1,653,283)
286,313
-
-
(1,653,283)
286,313
(1.14)
8.38
The Consolidated Statement of Profit or Loss and Other Comprehensive Income should be read in conjunction with the
accompanying notes.
HALF-YEAR FINANCIAL REPORT 31 DECEMBER 2024
Page 14 of 28
CONSOLIDATED STATEMENT OF FINANCIAL POSITION
AS AT 31 DECEMBER 2024
Notes
CURRENT ASSETS
Cash and cash equivalents
4
Trade and other receivables
5
Term deposit
Other current assets
4
TOTAL CURRENT ASSETS
31 Dec 2024
30 Jun 2024
1,039,239
3,011,924
$
$
6,000,000
6,500,000
89,697
39,622
78,667
341,957
7,207,603
9,893,503
Other receivables
115,155
115,155
Property, Plant and Equipment
160,083
Right of Use Asset
215,133
NON-CURRENT ASSETS
Exploration and evaluation assets
261,232
14,655,039
13,137,803
TOTAL NON-CURRENT ASSETS
15,145,410
13,705,224
TOTAL ASSETS
22,353,013
23,598,727
978,312
1,406,011
88,849
84,182
CURRENT LIABILITIES
Trade and other payables
Provision
6
191,034
7
Lease liability
47,103
32,902
1,114,264
1,523,095
Lease liability
133,135
178,943
TOTAL NON-CURRENT LIABILITIES
133,135
178,943
TOTAL LIABILITIES
1,247,399
1,702,038
NET ASSETS
21,105,614
21,896,689
22,981,538
22,867,439
(3,798,878)
(2,145,596)
21,105,614
21,896,689
TOTAL CURRENT LIABILITIES
NON-CURRENT LIABILITIES
EQUITY
Contributed equity
Reserves
Accumulated losses
TOTAL EQUITY
8
9
1,922,954
1,174,846
The Consolidated Statement of Financial Position should be read in conjunction with the accompanying notes.
HALF-YEAR FINANCIAL REPORT 31 DECEMBER 2024
Page 15 of 28
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
FOR THE HALF-YEAR ENDED 31 DECEMBER 2024
Issued
Capital
Reserves
Accumulated
Losses
Total Equity
100
-
(1,102,687)
(1,102,587)
Total comprehensive profit for the period
-
-
286,313
286,313
Other comprehensive profit
-
-
-
-
Total comprehensive profit for the period
net of tax
-
-
286,313
286,313
12,976,299
-
-
12,976,299
-
403,022
-
403,022
-
389,493
-
389,493
Balance at 31 December 2023
12,976,399
792,515
(816,374)
12,952,540
Balance at 1 July 2024
22,867,439
1,174,845
(2,145,595)
21,896,689
Total comprehensive loss for the period
-
-
(1,653,283)
(1,653,283)
Other comprehensive loss
-
-
-
-
Total comprehensive loss for the period net
of tax
-
-
(1,653,283)
(1,653,283)
114,099
-
-
748,109
-
114,099
748,109
22,981,538
1,922,954
(3,798,878)
21,105,614
$
Balance at 1 July 2023
$
$
$
Transactions with owners in their capacity
as owners
Contributions of equity, net of transaction
costs
Issue of Brokers Options
Share based payment
Transactions with owners in their capacity
as owners
Issue of shares for tenement acquisition (Note
8)
Share based payment (Note 9)
Balance at 31 December 2024
The Consolidated Statement of Changes in Equity should be read in conjunction with the accompanying notes.
HALF-YEAR FINANCIAL REPORT 31 DECEMBER 2024
Page 16 of 28
CONSOLIDATED STATEMENT OF CASH FLOWS
FOR THE HALF-YEAR ENDED 31 DECEMBER 2024
Notes
Half-year ended
31 Dec 2024
$
Half-year ended
31 Dec 2023
$
CASH FLOWS FROM OPERATING ACTIVITIES
Payments to suppliers and employees
(1,287,222)
(610,445)
Other revenue
35,073
-
Interest received
227,837
25,376
Net GST received
162,061
-
NET CASH FLOWS USED IN OPERATING ACTIVITIES
(862,251)
(585,069)
(1,566,370)
(286,014)
(2,923)
(7,540)
-
(50,000)
(1,569,293)
(343,554)
Proceeds from issue of shares (net of transaction costs)
-
1,574,826
Funds received in advance of IPO
-
12,677,000
Proceeds from borrowings
-
710,000
Repayment of borrowings
-
(650,000)
Lease payments
(41,141)
-
NET CASH FLOWS (USED IN)/FROM FINANCING
ACTIVITIES
(41,141)
14,311,826
Net increase/(decrease) in cash and cash equivalents
(2,472,685)
13,383,203
Cash at the beginning of the period
9,511,924
91,931
7,039,239
13,475,134
CASH FLOWS FROM INVESTING ACTIVITIES
Payments for exploration and evaluation assets
Payment for property, plant, and equipment
Payment for tenement assets acquisitions
NET CASH FLOWS USED IN INVESTING ACTIVITIES
CASH FLOWS (USED IN)/FROM FINANCING ACTIVITIES
CASH AT THE END OF THE PERIOD
4
The Consolidated Statement of Cash Flows should be read in conjunction with the accompanying notes.
HALF-YEAR FINANCIAL REPORT 31 DECEMBER 2024
Page 17 of 28
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
FOR THE HALF-YEAR ENDED 31 DECEMBER 2024
1. BASIS OF PREPARATION
The financial report is a general-purpose financial report that has been prepared in accordance with Australian
Accounting Standards, Australian Accounting Interpretations, other authoritative pronouncements of the
Australian Accounting Standards Board (“AASB”) and the Corporation Act 2001.
Australian Accounting Standards set out accounting policies that the AASB has concluded would result in a
financial report containing relevant and reliable information about transactions, events and conditions to which
they apply. The financial statements and notes also comply with International Financial Reporting Standards as
issued by the International Accounting Standard Board (IASB). Material accounting policies adopted in the
preparation of this financial report are presented below. They have been consistently applied unless otherwise
stated.
This interim financial report does not include all of the notes of the type normally included in an annual financial
report. Accordingly, this report is to be read in conjunction with the annual report for the period ended 30 June
2024. All accounting policies are consistent with those applied for the year ended 30 June 2024.
The Group is a for-profit entity for financial reporting purposes under Australian Accounting Standards. The
consolidated financial statements have been prepared on a going concern basis which contemplates the
continuity of normal business activities and the realisation of assets and the settlement of liabilities in the ordinary
course of business.
Kali Metals Limited is a company incorporated in Australia on 31 August 2021 and was a wholly owned subsidiary
of Kalamazoo Resources Limited (“Kalamazoo”). Kali demerged from Kalamazoo on 29 December 2023 following
completion of tenement sale agreement with Kalamazoo, and various other transactions as disclosed in the
Prospectus dated 3 November 2023. The Company commenced trading on the ASX on 8 January 2024.
2. STATEMENT OF MATERIAL ACCOUNTING POLICIES
Principles of Consolidation
Subsidiaries
The consolidated financial statements incorporate the assets and liabilities of all subsidiaries of Kali Metals Limited
as at 31 December 2024 and the results of all subsidiaries for the period then ended. Kali Metals Limited and its
subsidiary together are referred to in this financial report as the Group or the consolidated entity.
Subsidiaries are all entities (including structured entities) over which the Group has control. The Group controls
an entity when the Group is exposed to, or has rights to, variable returns from its involvement with the entity and
has the ability to affect those returns through its power to direct the activities of the entity. Subsidiaries are fully
consolidated from the date on which control is transferred to the Group. They are de-consolidated from the date
that control ceases.
Intercompany transactions, balances and unrealised gains on transactions between Group companies are
eliminated. Unrealised losses are also eliminated unless the transaction provides evidence of the impairment of
the asset transferred. Accounting policies of subsidiaries have been changed where necessary to ensure
consistency with the policies adopted by the Group.
HALF-YEAR FINANCIAL REPORT 31 DECEMBER 2024
Page 18 of 28
NOTES TO THE FINANCIAL STATEMENTS
FOR THE HALF-YEAR ENDED 31 DECEMBER 2024
New accounting standards and interpretations
In the half-year ended 31 December 2024, the Group has reviewed all of the new and revised Standards and
Interpretations issued by the AASB that are relevant to its operations and effective for annual reporting periods
beginning on or after 1 July 2024.
The adoption of the new and revised Standards and Interpretations have not had a material impact on this halfyear financial report.
Critical accounting estimates and judgements
The preparation of financial reports requires management to make judgements, estimates and assumptions that
affect the application of accounting policies and the reported amounts of assets and liabilities, income and
expenses. Actual results may differ from these estimates.
Significant accounting judgements
In the process of applying the Group’s accounting policies, management has m
Share your feedback
Discover