Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX Announcement
17 April 2025
March 2025 Quarterly Activities Report
Kali Metals Limited (ASX:KM1) (“Kali” or the “Company”) is pleased to present its Quarterly Report (“Report”)
for the period ended 31 March 2025 (“Quarter”).
Kali finished the Quarter in a strong cash position ($5.78m) following ongoing exploration work which centered
on the Marble Bar Project in the Pilbara, where the Company has shifted its primary focus to gold following
impressive rock chip results. The Company also continued its promising exploration in the Southern Lachlan
Fold Belt, with exceptional results (up to 16.7% SnO2) at Sweetwater.
Highlights
Pilbara
•
Gold-in-soil anomaly trend at Marble Bar Project increased by 80% from 5.1km to a 9.5km cumulative,
coherent strike length1
•
With only 10% of the gold-in-soil trend being mapped to date, Kali has already identified two key prospects
(Tiger and Sherman)2 which demonstrate gold mineralisation at surface
•
Acquired Florance Resources Pty Ltd and its two tenements to expand Marble Bar Project and Pilbara
footprint by ~19km3
•
At the Panther Lithium Prospect, two channels (31m and 9m length), cut across the main pegmatite
outcrop, returned results with average grades of 0.14% Li2O and 0.48% Li2O, respectively
Lachlan Fold Belt
•
14 new rock-chip samples from the Company’s Sweetwater Prospect returned results up to 16.7% SnO2,
along with accessory tantalum (up to 380ppm Ta) and niobium (up to 580ppm Nb). Following the
exploration success, Kali has collected approximately 350 soil samples, and is awaiting those results
•
Tin mineralisation now confirmed over a cumulative strike length of 3.9km, a 50% increase on the 2.0km
mapped by December 20244, with outcrop varying up to 20m in width
•
Airborne LiDAR survey completed at Mt Cudgewa area (tenement EL7786, VIC) following a prospectivity
assessment
Corporate
•
Strong cash position, with $5.78m available at the end of the Quarter, with zero debt
1 Refer KM1 ASX announcement dated 21 January 2025
2 Refer KM1 ASX announcement 15 October 2024
3 Refer KM1 ASX announcement dated 18 March 2025
4 Refer KM1 ASX announced dated 04 December 2024
ASX : KM1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 1 of 23
Figure 1: Kali’s portfolio of Australian assets
Pilbara Projects
Kali’s Marble Bar Project is located in the eastern region of the Pilbara, approximately 30km east of the town
of Marble Bar and its historic gold mining centre (Refer Figure 2). Covering approximately ~42km2, the project
geology comprises the Mount Edgar Granitic Complex and Warrawoona Greenstone Belt (sedimentary and
volcanic rocks).
In October 2024, Kali announced the renegotiated terms of its JV with SQM Australia, including increasing
SQM Australia’s total spend to $4.25M by 15 December 2026 in order for SQM Australia to earn a 50% interest
in Kali’s DOM’s Hill and Pear Creek Projects5. As part of the change in terms, Kali retained 100% ownership of
the Marble Bar Project.
The Company advised in January, following promising gold results reported from its Marble Bar Project, it
would be shifting its primary focus at Marble Bar to gold exploration, with lithium remaining an important
secondary focus.
5 Refer KM ASX announcement dated 7 October 2024
ASX : KM1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 2 of 23
Figure 2: Kali’s Pilbara Tenure
Marble Bar Gold-Lithium Project
Gold Anomaly increases 80% to >9km
In December 2024, multi-element geochemistry results from 610 historical soil samples, not previously been
tested for gold, were compiled and identified a 5.1km gold strike6. Following that, in January 2025, Kali
reported that further gold-in-soil sample assay results received from its Marble Bar Project had extended the
recently identified7 gold-in-soil anomaly trend by 80% from 5.1km to a 9.5km cumulative, coherent strike
length (Refer Figure 3). The more recent assay results8 support the Company’s previous interpretation of a
gold-in-soil anomalism. The previous anomaly areas were extended along strike and new additional anomalous
zones identified.
The mineralised structures at both the Sherman and Tiger Prospects are characterised by dominant NWWNW trending quartz veins, in a similar orientation to the gold-in-soil anomalies (Refer Figure 3).
The shapes of the anomalies appear offset along the trends that coincide with magnetic-low features inferred
from regional magnetic (RTP1VD) imagery, likely representing the geological faults that have segmented the
6 Refer KM1 ASX announcement dated 11 December 2024
7 Refer KM1 ASX announcement dated 11 December 2024
8 Refer KM1 ASX announcement dated 11 December 2024
ASX : KM1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 3 of 23
underlaying geology into major blocks. Occasionally, gold anomalism occurs along these offsetting mag-low
features.
Field work recommenced during the Quarter with the intention of identifying and defining potential targets for
future drill programs, Kali expects to announce the results of this follow-up work in the current Quarter.
Figure 3: Marble Bar Project (SW area) gold-in-soil results
Figure 4: Marble Bar Project (NE area) gold-in-soil results
ASX : KM1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 4 of 23
Lithium Exploration
The pegmatites at the Panther Prospect are NW-striking, hosted in gneissic granite. The pegmatites sit flatly
over the top of granitic outcrops and to the east the dip increases from gentle to steep (Refer Figure 5). The
sampled pegmatite true thickness is estimated at approximately 10m.
Previous reconnaissance at this locality returned outcrop rock-chip samples between 0.35% Li2O and 1.8%
Li2O9. Two channels with lengths of 31m and 9m were located ~50m apart along the strike. The channels were
cut (with a battery-powered rock saw) 6-7cm wide and 3-4cm deep, to simulate HQ half-core rock volume.
Every sample length was photographed before and after cutting, geologically logged and rock recovery was
recorded. The start, end and inflection points in trajectory were picked up with DGPS. Sample length was
nominally 1m, honouring the geological boundaries where required. Channels were sampled continuously, with
10% control samples (duplicates, standards and blank samples).
Samples were submitted to ALS Wangara, Perth for sample preparation (crushing and pulverising) and
analysed with a combination of methods sodium peroxide fusion, ME-ICP89 (ICP-AES) and ME-MS91 (ICPMS). The channel sampling results from the north-west part of Panther Prospect from the two trenches
returned 31m @ 0.14% Li2O and 9m @ 0.48 Li2O10.
Further lithium exploration towards the south-east part of the prospect and at depth to the west where the
thicker pegmatite bodies could occur (Refer Figure 5) would be warranted at a future date.
Figure 5: Panther Lithium Prospect geology plan map and rock-chip-sampling results
9 Refer KM1 ASX announcements dated 4 January 2024 and 15 October 2024
10 Refer KM1 ASX announcement dated 21 January 2025
ASX : KM1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 5 of 23
Pilbara Gold Tenure Expanded
In March, Kali advised it had expanded its Pilbara gold tenure by ~19km2, having entered into a binding
agreement to acquire two new tenements form Florance Resources Pty Ltd. The two tenements are adjacent
(E45/6429) and contiguous (E45/6430) to Kali’s 100%-owned Marble Bar Gold-Lithium Project (Refer Figure
6).
This acquisition not only builds on the Company’s existing footprint in the area but strengthens Kali’s key focus
on gold at Marble Bar, a highly prospective gold region.
Figure 6: Kali’s Marble Bar Gold-Lithium Project
Transaction Details
Consistent with Kali’s expenditure conservation strategy, the acquisition of these new exploration licences
from Florance Resources Pty Ltd consisted primarily of scrip consideration.
The key terms of the transaction were:
•
Kali acquired 100% of the issued capital of Florance Resources Pty Ltd; and
•
The consideration payable was:
o
$30,000 cash; and
o
$200,000 worth of ordinary shares in the Company, based on a VWAP in the 5 days prior to
execution.
ASX : KM1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 6 of 23
Southern Lachlan Fold Belt Projects
Kali holds the Jingellic (NSW) and Tallangatta (VIC) Projects in the Southern Lachlan Fold Belt (Refer Figure 7).
The Southern Lachlan Fold Belt hosts sites associated with economically significant production of precious
and base metals in addition to tin, tantalum, niobium and tungsten.
Jingellic Project - NSW
The Jingellic Project covers approximately 1,220km2, consisting of tenements EL9403, EL9507 and EL895811.
Kali’s initial exploration focus has been the highly prospective Sweetwater area (EL9403) which contains
several historic tin mines and the recently identified lithium-bearing pegmatites12.
Figure 7. Location map of Kali Metals’ Jingellic and Tallangatta Projects
11
KM1 owns the tin, tungsten, lithium, caesium and tantalum rights to EL8958
12 KM1 ASX Announcement 28 June 2024
ASX : KM1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 7 of 23
Sweetwater Area
The main tin mines around Sweetwater include the Mullengandra, McLurg’s and Parsons-Hunter mines (as well
as dozens of smaller workings) which were active in the early 1900s (Refer Figure 9). Tin mineralisation is
associated with the mineral cassiterite (the main economic tin mineral) (Refer Figure 8). Kali initially completed
a historical data review, revealing these high-grade tin-bearing workings also contain significant amounts of
tantalum and niobium, adding to the potential prospectivity of the area. 13
The Sweetwater area also hosts notable LCT pegmatites, with the two most prominent pegmatites identified
to date being the Giant Pegmatite and the BFG Pegmatite. The Company has recently collected four rock chip
samples at the Giant Pegmatite with assay results confirming LCT-type mineralisation ranging from 0.661.54% Li2O10. The BFG pegmatite is made of two dykes with 1km total length, identified from LiDAR imagery.
A LiDAR survey carried out in February 2024 has proved useful in identifying the long-forgotten historical tin
workings. Soil sampling, carried out during Q3 2024, identified several km-scale tin, tungsten, tantalum and
lithium anomalies14. Kali then initiated geological mapping along the zones of interest in Q4 2024, and has
collected approximately 350 samples to date.
Figure 8. Large cassiterite (tin-oxide) dark mineral crystals and aggregates, from the Sweetwater area: L)
Sample SWR029 (16.70% SnO2) and R) Sample SWR030 (8.65% SnO2)
Cautionary statement: Visual estimates of mineral abundance should never be considered a proxy or substitute for
laboratory analyses where concentrations or grades are the factor of principal economic interest. Visual estimates
also potentially provide no information regarding impurities or deleterious physical properties relevant to valuations.
Please refer to Annexure C “Visual Observations” in KM1 ASX Announcement 10 February 2025.
13 KM1 ASX Announcement 28 June 2024
14 KM1 ASX Announcement 10 September 2024
ASX : KM1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 8 of 23
Kali reported the results from the latest 14 samples on 10th February 202515.
11 of the 14 rock chip samples returned high-grade samples of > 1% SnO2 (best 16.7% SnO2) and 3 lower grade
samples between 0.18% and 1.0% tin-oxide16, often accompanied with notable tantalum and niobium results.
Due to potential nugget effects, these results cannot be considered a true representation of the overall tenor
of mineralisation at the Sweetwater Prospect. This parameter remains unknown.
The mineral trends identified to date are the Mullengandra trend (mineralised rocks > 1.4km length), a newlydiscovered Keogh trend (mineralised rocks > 800m length), McLurg’s trend (mineralised rocks > 1.2km length),
Giant Pegmatite (mineralised rocks > 400m length) and Hunter-Parsons trend (mineralised rocks > 100m
length). The width of mineralised outcrop at surface varies from 1m to 20m (not a true thickness) 17.
Figure 9. Sweetwater area, geology plan map showing rock-chip sampling results
15 Refer Annexure B “Reported Results” ASX announcement dated 10 February 2025 and previous ASX announcement dated
4 December 2024
16 Refer KM1 ASX announcement dated 10 February 2025
17 See Annexure C “Visual Observations” ASX announcement dated 10 February 2025 for further information on cassiterite
mineralisation.
ASX : KM1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 9 of 23
Tallangatta Project – VIC
Mt Cudgewa Area
Located 42km east-southeast of Sweetwater area is the Mt Cudgewa area, where surrounding historical tin
mining comprised a combination of alluvial and hard-rock sources.
The Mt Cudgewa “tin field” covers an area approximately 5x2km. The alluvial workings are located along
several creeks (Lady Creek, Grassy Creek, Cudgewa Creek and other). The hard-rock workings are located in
the nearby hills, expressed by pits, trenches and shafts (Refer Figure 10).
Kali commissioned MNG Survey (mngsurvey.com.au) to acquire the data over a 56km 2 area (at +15pt/m2
density, 7cm GSD air photo resolution, ±2.5cm relative vertical accuracy), and GeoCloud Analytics
(geocloudanalytics.com) to extract the ground model detail (through the particularly dense forest cover) and
complete the data interpretation. The survey was flown in late-December 2024 and data was processed and
interpreted in early-January 2025.
Figure 10. Mt Cudgewa, details from LiDAR image showing historical hard-rock workings
The data processing and interpretation uncovered numerous locations of interest in very high detail. The
LiDAR imagery assisted with the initial soil sampling campaign and will prove invaluable in the upcoming initial
reconnaissance over Mt Cudgewa, planned for Q2 2025.
ASX : KM1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 10 of 23
Soil Sampling
Kali commenced an initial soil sampling campaign over Mt Cudgewa, comprising 880 sampling locations in a
ridge-and-spur sampling style (Refer Figure 11).
The survey area is divided in three zones:
•
Zone A in the immediate vicinity of historical workings (samples spacing 50m)
•
Zone B in an area of possible extensions of mineralised structures
•
Zone C in areas with potential to host distal tin-bearing structures
The soil sampling campaign is ongoing, with approximately 350 samples collected to date.
Figure 11. Mt Cudgewa planned soil sampling program
ASX : KM1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 11 of 23
Higginsville Lithium District
The Higginsville Lithium District covers approximately 1,571km 2 of land holding with Kali owning 100% of the
lithium and associated battery mineral rights across these tenements.
Within the Higginsville Lithium District portfolio, eight projects have been identified as having a prospective
geological setting to host LCT pegmatites. Some of these areas have existing mapped outcropping
pegmatites with Spodumene identified, while in other areas, pegmatite occurrences have been logged as part
of the historic core review program.
At Higginsville, Kali continued to progress its geophysical review of the entire Project with a view towards
target generation.
.
ASX : KM1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 12 of 23
Figure 12: Higginsville Lithium District
Corporate
RIU Explorers Conference, Fremantle
Kali presented at the RIU Explorers Conference, which was held in Fremantle, Western Australia during
February.
A copy of the presentation can be viewed on the Company’s website
https://kalimetals.com.au/presentations/
Compliance
For the purpose of Listing Rule 5.3.1, details of the Company's group exploration activities for the Quarter,
including any material developments or material changes in those activities, and a summary of the expenditure
incurred on those activities is set out in the relevant sections above.
For the purpose of Listing Rule 5.3.2, the Company confirms that there were no mining production and
development activities during the Quarter by the Company or its subsidiaries.
In accordance with ASX Listing Rule 5.3.4, a comparison of the use of funds as per the Kali Prospectus dated
3 November 2023 (Prospectus) and actual use of funds since ASX admission is presented below:
Prospectus estimate
(2 year period
following admission)
($ million)
Actual use from
admission until 31
March 2025
Exploration Expenditure
10.65
5.94
4.71
Exploration management, staff,
& administration
3.85
2.83
1.02
Expenses of the Offer
1.78
1.99
(0.21)
Total
16.28
10.76
5.52
Use of Funds
Variance
($ million)
($ million)
A favourable variance in Exploration Expenditure and administration being below the Prospectus estimates
are due to the Company only being admitted in January 2024 and accordingly, being less than 18 months into
the period of 2 years underlying the Prospectus estimates. Exploration management, staffing, and
administrative expenses were higher than anticipated, largely due to the Company entering into a new office
lease in the prior year, along with increased ongoing compliance and corporate administration costs. Actual
expenses of the offer were higher than estimated due to the cost overrun on legal expenses associated with
the Offer.
In accordance with ASX Listing Rule 5.3.5, payments to related parties during the Quarter as outlined in
Sections 6.1 and 6.2 of the Appendix 5B consisted of $126k in directors’ fees and fees to the Managing
Director under his executive services agreement.
ASX : KM1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 13 of 23
Tenement Summary
The following information is provided pursuant to Listing Rule 5.3.3 for the quarter ended 31 March 2025.
Pilbara Project
Tenement
% Beginning of Period
% End of Period
E45/4722-I
100%
100%
E45/4887
100%
100%
E45/4919
100%
100%
E45/5146
100%
100%
E45/5943
100%
100%
E45/5934
100%
100%
E45/5935
100%
100%
E45/4700
100%
100%
E45/5970
100%
100%
E45/3856-I
100%
100%
E45/4616-I
100%
100%
E45/5813
100%
100%
E45/6429
0%
100%
E45/6430
0%
100%
Tenement
% Beginning of Period
E15/1037
100% Lithium and
associated mineral rights1
% End of Period
100% Lithium and associated mineral rights1
E15/1094
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
100% Lithium and associated mineral rights1
100% Lithium and
Higginsville Lithium District
E15/1197
associated mineral rights1
E15/1199
E15/1203
100% Lithium and associated mineral rights1
100% Lithium and
1
associated mineral rights
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
E15/1223
E15/1260
100% Lithium and associated mineral rights1
100% Lithium and
1
associated mineral rights
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
E15/1298
E15/1402
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
E15/1423
E15/1448
100% Lithium and associated mineral rights1
100% Lithium and
1
associated mineral rights
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
E15/1458
E15/1459
100% Lithium and associated mineral rights1
100% Lithium and
1
associated mineral rights
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
E15/1461
E15/1462
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
E15/1464
ASX : KM1
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 14 of 23
E15/1487
E15/1512
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
E15/1533
E15/1541
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
E15/1586
E15/1613
E15/1620
100% Lithium and associated mineral rights1
100% Lithium and
1
associated mineral rights
100% Lithium and associated mineral rights1
100% Lithium and
1
associated mineral rights
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
E15/1628
E15/1792
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
E15/1793
E15/1822
100% Lithium and associated mineral rights1
100% Lithium and
1
associated mineral rights
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
E15/1853
E15/1863
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
E15/1882
E15/1939
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
E15/1940
E15/786
100% Lithium and associated mineral rights1
100% Lithium and
1
associated mineral rights
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
E15/808
E15/810
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
E15/828
E63/1051
100% Lithium and associated mineral rights1
100% Lithium and
1
associated mineral rights
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
E63/1117
E63/1142
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
E63/1165
E63/1712
100% Lithium and associated mineral rights1
100% Lithium and
1
associated mineral rights
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
E63/1724
E63/1725
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
E63/1726
E63/1727
100% Lithium and associated mineral rights1
100% Lithium and
1
associated mineral rights
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
ASX : KM1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 15 of 23
E63/1728
E63/1738
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
E63/1756
E63/1763
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
E63/1876
E63/1881
100% Lithium and associated mineral rights1
100% Lithium and
1
associated mineral rights
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
E63/1900
E63/1901
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
E63/2107
E63/2108
100% Lithium and associated mineral rights1
100% Lithium and
1
associated mineral rights
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
E63/2275
M15/1132
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
M15/1133
M15/1134
100% Lithium and associated mineral rights1
100% Lithium and
1
associated mineral rights
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
M15/1135
M15/1790
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
M15/1792
M15/1806
100% Lithium and associated mineral rights1
100% Lithium and
1
associated mineral rights
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
M15/1814
M15/1828
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
M15/1872
M15/1873
100% Lithium and associated mineral rights1
100% Lithium and
1
associated mineral rights
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
M15/225
M15/231
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
M15/289
M15/31
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
M15/325
M15/338
100% Lithium and associated mineral rights1
100% Lithium and
1
associated mineral rights
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
M15/348
ASX : KM1
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 16 of 23
M15/351
M15/352
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
M15/375
M15/506
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
M15/507
M15/512
100% Lithium and associated mineral rights1
100% Lithium and
1
associated mineral rights
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
M15/528
M15/580
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
M15/581
M15/597
100% Lithium and associated mineral rights1
100% Lithium and
1
associated mineral rights
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
M15/610
M15/616
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
M15/620
M15/629
100% Lithium and associated mineral rights1
100% Lithium and
1
associated mineral rights
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
M15/639
M15/640
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
M15/642
M15/651
100% Lithium and associated mineral rights1
100% Lithium and
1
associated mineral rights
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
M15/665
M15/680
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
M15/681
M15/682
100% Lithium and associated mineral rights1
100% Lithium and
1
associated mineral rights
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
M15/683
M15/684
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
100% Lithium and associated mineral rights1
100% Lithium and
associated mineral rights1
M15/685
M15/710
100% Lithium and associated mineral righ
Share your feedback
Discover