Annual Report
Released
Released
Announcement PDF
Limited
ACN 653 279 371
AND ITS CONTROLLED ENTITY
ANNUAL REPORT
For the year ended 30 June 2024
CONTENTS
CORPORATE DIRECTORY ................................................................................................................................................... 2
CHAIRMAN’S LETTER ........................................................................................................................................................... 3
DIRECTORS’ REPORT ............................................................................................................................................................ 4
AUDITOR’S INDEPENDENT DECLARATION ................................................................................................................ 40
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME
FOR THE YEAR ENDED 30 JUNE 2024 .......................................................................................................................... 41
CONSOLIDATED STATEMENT OF FINANCIAL POSITION AS AT 30 JUNE 2024 ............................................ 42
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY FOR THE YEAR ENDED 30 JUNE 2024 ............ 43
CONSOLIDATED STATEMENT OF CASH FLOWS FOR THE YEAR ENDED 30 JUNE 2024 ........................... 44
NOTES TO THE FINANCIAL STATEMENTS .................................................................................................................. 45
CONSOLIDATED ENTITY STATEMENT AS AT 30 JUNE 2024 ................................................................................ 65
DIRECTORS’ DECLARATION............................................................................................................................................. 66
INDEPENDENT AUDITOR’S REPORT ............................................................................................................................. 67
CORPORATE GOVERNANCE STATEMENT ................................................................................................................... 71
ASX ADDITIONAL INFORMATION ................................................................................................................................. 72
ANNUAL REPORT 2024
Page 1 of 81
CORPORATE DIRECTORY
DIRECTORS
Luke Reinehr
Paul Adams
Graeme Sloan
John Leddy
Simon Coyle
Non-Executive Chairman
Managing Director
Non-Executive Director
Non-Executive Director
Non-Executive Director
COMPANY SECRETARY
Nick Madders
CHIEF FINANCIAL OFFICER
Silfia Morton
REGISTERED OFFICE & PRINCIPAL PLACE OF BUSINESS
Ground Floor, 34 Colin Street
West Perth, WA 6005
Telephone: +61 (8) 6424 8880
Web: www.kalimetals.com.au
SHARE REGISTER
Automic Registry Services
Level 5, 191 St Georges Terrace
Perth, WA 6000
Telephone: 1300 288 664
AUDITOR
BDO Audit Pty Ltd
Level 9, Mia Yellagonga Tower 2
5 Spring Street
Perth, WA 6000
SECURITIES EXCHANGE LISTING
The Company is listed on the Australian Securities Exchange Ltd (ASX) and the Frankfurt Stock Exchange
(FSE).
ASX Code: KM1
FSE Code: 6OB
ANNUAL REPORT 2024
Page 2 of 81
CHAIRMAN’S LETTER
Dear Shareholders,
Welcome to Kali Metals Limited’s (ASX: KM1) first Annual Report. This is clearly a milestone for the Company as it
marks our first year as a listed entity on the Australian Securities Exchange (ASX) since our successful listing in
January 2024.
Kali has been established from the strategic spin out of a portfolio of Australian lithium assets, initially held by
ASX-listed Kalamazoo Resources Limited (ASX: KZR), and with the lithium mineral rights of TSX-listed Karora
Resources Inc’s (TSX: KRR) across a range of projects south of Kalgoorlie in Western Australia, the Northern
Territory, New South Wales and Victoria.
Following completion of our Initial Public Offering (IPO) which successfully raised the maximum $15 million, the
Company is pleased to announce that Kali Metals has established a strong platform to execute our strategy to
explore and develop one of the largest and most prospective exploration portfolios across Australia’s hard-rock
lithium fields.
Upon listing, Kali Metals held an enviable 3,854km2 portfolio of lithium projects across Western Australia, New
South Wales and Victoria. Our Western Australia tenure is strategically located adjacent to some of the world’s
largest hard rock mines and deposits, including those held by one of our major shareholders, Mineral Resources
Limited (ASX: MIN).
The primary objective of the IPO was to raise funds to explore and develop our highly prospective lithium
exploration tenure, with a strong focus on the Higginsville Lithium District in the Eastern Yilgarn region, WA.
Despite challenging market conditions for lithium, Kali Metals has progressed its exploration program as promised
and is emerging into a leading critical minerals exploration company.
In our initial months as a listed company, improving our understanding of the geology at Higginsville has been
our key focus. Our early-stage activities at Higginsville culminated in a maiden drilling campaign at our Spargoville
Project, one of eight projects areas identified within the Companies Higginsville district.
The early drilling results have provided the necessary momentum to initiate follow up drilling at not only
Higginsville, but across our project portfolio in the Pilbara and Lachlan Fold Belt, where exploration activities are
set to accelerate in the new financial year.
I would like to extend my heartfelt thanks to our inaugural Managing Director, Graeme Sloan, whose leadership
was instrumental in our successful IPO. While Mr. Sloan has retired from his role as Managing Director, he
continues to support Kali Metals in his new capacity as a Non-Executive Director.
We are pleased to welcome Paul Adams, an experienced mining executive with a wealth of technical expertise
and commercial acumen, as our new Managing Director. Paul, previously a Non-Executive Director of Kali Metals,
was appointed to replace Mr. Sloan, and is now leading the Company through its critical exploration phase.
In conclusion, I would like to express my deep appreciation to all of Kali Metals’ employees for their hard work
and commitment to successfully guide the Company through its IPO process and our first year as a publicly listed
entity. I also extend my sincere thanks to our shareholders for the unwavering support and confidence in Kali
Metals since our inception, through our IPO, and into our ongoing activities.
We are now firmly on the path to accelerating our exploration programs, with the intention of making Australia’s
next major lithium discovery. The past financial year has been a positive step forward for Kali Metals, and we
anticipate another busy and productive year ahead. We look forward to keeping you updated on our progress
as we continue this exciting journey.
Yours sincerely,
Luke Reinehr
Non-Executive Chairman
ANNUAL REPORT 2024
Page 3 of 81
DIRECTORS’ REPORT
The Directors present their report, together with the financial statements, on Kali Metals Limited (“the
Company” or “the Group” or “Kali”) and the entity it controls for the year ended 30 June 2024. The Company
was incorporated as a private company (Kali Metals Pty Ltd) on 31 August 2021 and on 21 April 2023 the
Company converted to a public company (Kali Metals Limited). The Group was a wholly owned subsidiary
of Kalamazoo Resources Limited (“Kalamazoo”) and on 29 December 2023, the Group demerged from
Kalamazoo following the issue of shares for the acquisition of various mining assets.
DIRECTORS
The following persons were directors of the Company during the whole of the financial period and up to the
date of this report, unless noted otherwise:
•
Luke Reinehr
Non-Executive Chairman (appointed 31 August 2021)
•
Paul Adams
Managing Director (commenced 01 July 2024, previously Non-Executive Director
appointed on 31 August 2021)
•
Graeme Sloan
Non-Executive Director (commenced 01 July 2024, previously Managing Director
appointed on 19 May 2023)
•
John Leddy
Non-Executive Director (appointed 19 May 2023)
•
Simon Coyle
Non-Executive Director (appointed 19 May 2023)
PRINCIPAL ACTIVITIES
The Group is a minerals exploration Group with a focus on lithium and other critical minerals. Following the
successful admission to the ASX Official List on 8 January 2024, the Group has rights to explore across three
highly prospective lithium regions, being the Pilbara region of Western Australia, the Eastern Yilgarn region
in Western Australia, and the Lachlan Fold Belt region across Victoria and New South Wales. The lithium
projects across these regions consist of:
a)
b)
c)
d)
e)
f)
Higginsville Project
DOM’s Hill Project
Marble Bar Project
Pear Creek Project
Jingellic Project
Tallangatta Project
OPERATING RESULTS
The loss of the Group after providing for income tax for the year ended 30 June 2024 was $1,042,908 (2023:
loss of $1,068,132).
REVIEW OF OPERATIONS
Initial Public Offer and Commencement of Trading
Kali Metals (“Kali” or “the Company”) is an Australian resources company which successfully commenced
trading on the Australian Securities Exchange (ASX) on 8 January 2024. The Company's Initial Public Offering
(IPO) was heavily oversubscribed, raising the maximum amount of $15 million (before costs) through the
issuance of 60,000,000 shares at $0.25 per share.
Kali Metals was formed from the spin-out of Australian lithium assets owned by Kalamazoo Resources
Limited (ASX: KZR) and the lithium mineral rights of Canadian gold miner Karora Resources Inc. (TSX: KRR).
Bell Potter Securities Limited and Canaccord Genuity (Australia) Limited acted as Joint Lead Managers for
the IPO, with Grant Samuel as the financial adviser and Gilbert + Tobin as the legal adviser.
ANNUAL REPORT 2024
Page 4 of 81
DIRECTORS’ REPORT (CONTINUED)
Figure 1. Kali’s portfolio of Australian lithium assets
Kali Metals has a portfolio of lithium exploration projects spanning Western Australia (WA), New South Wales
(NSW), and Victoria (VIC). The portfolio covers 3,854 km², with key projects located near some of the world's
largest hard rock (spodumene) mines in the Pilbara and Eastern Yilgarn regions of WA. Notable projects
(refer Figure 1) include:
1.
Eastern Yilgarn, WA: Higginsville Lithium Project
2. Pilbara Region, WA: DOM’s Hill, Marble Bar, and Pear Creek Lithium Projects
3. NSW/VIC: Jingellic and Tallangatta Lithium Projects
Funds raised from the IPO are due to be allocated to exploring and developing Kali's lithium tenure, with a
primary focus on the Higginsville Lithium Project. Additionally, the funds covered IPO expenses, listing costs,
and general working capital.
Two of Kali’s Pilbara lithium projects (DOM’s Hill and Marble Bar) are fully funded by SQM as part of a joint
venture. SQM are currently solely funding the exploration activities at the project to earn an initial 30% and
up to 70% in the DOM’s Hill and Marble Bar Project.
Higginsville Lithium District, Western Australia
Kali Metals’ Higginsville Lithium District spans approximately 1,571km², with the Company holding 100% of
the lithium and associated battery mineral rights across all tenements. Within this district, eight projects
(Figure 2) have been identified as having a geological setting conducive to hosting lithium-caesium-tantalum
(“LCT”) pegmatites. Some areas already have mapped outcropping pegmatites with identified spodumene,
while others show pegmatite occurrences within existing drilling intercepts from an extensive historical gold
drilling database. Kali's exploration team is prioritizing exploration programs based on prospectivity,
enabling a systematic approach across the entire Higginsville Lithium District.
ANNUAL REPORT 2024
Page 5 of 81
DIRECTORS’ REPORT (CONTINUED)
Figure 2. Higginsville Lithium District
Exploration Programs
Once Kali Metals was listed, the Company’s exploration team quickly commenced exploration on the highest
priority targets, based on prospectivity. This approach has been designed to optimise exploration across the
entire district.
Geochemical Program
A large-scale geochemical sampling program commenced in January 2024, initially focusing on the
Spargoville and Widgiemooltha projects, with over 20,000 soil samples planned to refine lithium anomalies
identified in earlier surveys.
Within the Spargoville Project, results extended the Flynn-Giles prospect anomaly to the north – northeast,
whilst the early positive results received from the Parker-Grubb prospect anomaly have identified a lithium
anomaly with a strike length of over ~2.0kms to the northeast in parallel to the main Flynn-Giles anomaly
trend (Refer Figure 3).
The first results of the geochemical program highlighted a large-scale lithium system with multiple trends of
anomalies spanning over a combined strike of ~4km, an area size that exceeded initial expectations.
ANNUAL REPORT 2024
Page 6 of 81
DIRECTORS’ REPORT (CONTINUED)
Highlights of the rock chip sampling program results include 1, 2
0F
Spargoville Project:
1. Flynn-Giles Prospect
2. Parker-Grubb Prospect
3. Flynn-Giles Prospect
4. Flynn-Giles Prospect
KCSA071
KCSA049
KCSA070
KCSA069
1F
5.05% Li20
3.69% Li20
2.64% Li20
2.57% Li20
Figure 3. Spargoville Project Map showing soil survey and rock chip results
1
ASX: KM1 13 February 2024 “More High-Grade Lithium at Higginsville Lithium District” ASX: KM1 10 January 2024 “Spodumene
identified at Higginsville Lithium District”
2
ASX: KM1 10 January 2024 “Spodumene identified at Higginsville Lithium District”
ANNUAL REPORT 2024
Page 7 of 81
DIRECTORS’ REPORT (CONTINUED)
The initial phase of the soil sampling program at the Widgiemooltha Project focused on an area identified
through prior ground fieldwork, which revealed outcropping LCT pegmatites. The survey results indicate a
significant anomaly extending over 800 meters, aligned with the pegmatite trends in the northern sector of
the Widgiemooltha Project. Notably, the anomaly shows a broader response on the eastern side of the
outcropping pegmatites, suggesting a potential extension of the pegmatite system's width beneath the
shallow alluvial cover. High-grade lithium values from rock chip samples, distributed along the pegmatite
trends, are illustrated in Figure 4.
Widgiemooltha Project:
1. Arc Prospect
2. Wireless Prospect
3. Arc Prospect
KCSA080
KCSA085
KCSA082
2.21% Li20
2.14% Li20
1.60% Li20
Figure 4. Widgiemooltha Project area with Soil sampling anomaly trend and rock chip sample results
Geological Findings:
X-ray Diffraction (XRD) and Scanning Electron Microscope (SEM) analysis confirmed spodumene as the
dominant mineral in multiple areas, with significant lithium mineralization (up to 5.05% Li2O3) detected in
rock chip samples from Spargoville and Widgiemooltha.
The Flynn-Giles and Parker-Grubb prospects within the Spargoville Project have shown substantial
spodumene-bearing pegmatite trends, extending up to 2kms.
ANNUAL REPORT 2024
Page 8 of 81
DIRECTORS’ REPORT (CONTINUED)
Quantitative Sample Analysis
During the reporting period, eight pegmatite samples, believed to contain weathered spodumene, were
selected across the Spargoville and Widgiemooltha Projects to determine whole rock mineralogy and
confirm spodumene presence. Samples from historic workings at the Flynn-Giles Prospect and outcropping
pegmatites at Widgiemooltha were analysed. The results have enhanced the exploration team's ability to
visually identify weathered spodumene and lithium content in the field for future exploration activities (Refer
Table 1). The samples were submitted to RSC for XRD analysis, with two (KCSA080 and KCSA085) undergoing
further SEM-automated mineralogy analysis (Refer Table 2).
Table 1. State of weathered Spodumene observed in samples taken from workings at Flynn-Giles
Samples
KCSA069
KCSA070
KCSA071
Project
Spargoville Project
Spargoville Project
Spargoville Project
State of Weathering
Significantly
Partially
Minor
Table 2. The results of the rock chip sampling XRD analysis program
Samples
Project
Assay
Li2O
(%)
Spodumene
(wt.%)
Quartz
(wt.%)
Albite
(wt.%)
Muscovite
(wt.%)
Microcline
(wt.%)
Orthoclase
(wt.%)
KCSA071
Spargoville
5.05
67.2
21.1
0.8
2.3
<0.1
<0.1
KCSA080
Widgiemooltha
2.21
45.4
28.9
18.0
4.6
3.1
>0.1
KCSA085
Widgiemooltha
2.14
43.2
40.9
10.3
4.0
1.6
<0.1
KCSA070
Spargoville
2.64
22.2
59.0
3.0
1.3
2.8
<0.1
KCSA069
Spargoville
2.57
20.3
33.2
<0.1
7.4
1.4
<0.1
KCSA076
Spargoville
0.46
4.2
27.9
43.3
2.5
19.1
1.8
KCSA079
Widgiemooltha
0.73
4.0
8.6
7.3
5.6
62.6
6.9
KCSA087
Widgiemooltha
0.63
8.3
34.1
49.4
1.6
6.6
<0.1
Phase 1 Drilling Program
During the reporting period, Kali completed its maiden Reverse Circulation (RC) drilling program at the
Higginsville District, focusing on outcropping pegmatites and known spodumene occurrences by expanding
exploration along strike and down dip. This tested the Flynn-Giles and Green Flame prospect areas.
The program was designed to test beneath outcropping pegmatites and associated geochemical anomalies
to ascertain the potential for lithium mineralisation. The program consisted of relatively shallow RC drilling,
with the deepest hole testing approximately 100m below surface (vertical).
The results from the Phase 1 drilling program were announced post-reporting period. The maiden drill
program has been fundamental to expanding the Company’s knowledge of the geological setting at the
Flynn-Giles and Green Flame prospects, and the Spargoville Project more broadly. The results from the first
phase of RC drilling have provided the Company with lithium mineralised drill intersections containing
Spodumene and significant information to assist in understanding the geology of the host rocks, the nature
of the pegmatite systems within the Spargoville Project and facilitate the identification of targets for future
drilling programs.
ANNUAL REPORT 2024
Page 9 of 81
DIRECTORS’ REPORT (CONTINUED)
Historic Data Analysis:
A dedicated team has been established to undertake an analysis of Karora Resources' extensive historical
gold drilling database to better understand lithium-bearing pegmatites logged in over 755 lithological
entries. This information will guide the re-logging, sampling, and assay of historic drill cores, accelerating the
identification of lithium intersections at depth.
Pilbara Project, Western Australia
Kali’s Pilbara Projects include DOM’s Hill and Marble Bar, which are located adjacent to the worldclass lithium deposits Pilgangoora 305Mt @ 1.10% Li2O and Wodgina 259Mt @ 1.17% Li2O. Kali and SQM
have an Earn-in Agreement, which covers the DOM's Hill and Marble Bar Projects. Under this agreement,
SQM has the right to earn up to a 70% stake by contributing A$12 million in funding over four years.
Figure 5. Kali Metals Pilbara Projects
Southern Lachlan Fold Belt, Victoria & NSW
Jingellic Lithium Project
The Jingellic Project located in the Lachlan Fold Belt, NSW, is an ‘early mover’ play in an emerging LCT
pegmatite province consisting of the 100% owned EL9403 and EL9507, plus the LCT and tin-tungsten rights
to EL8958 (shaded blue in Figure 6). This tenement package covers approximately a total of 1,220 km2.
On 7 March 2024, Kali exercised the option outlined in its Prospectus dated 3 November 2023, and entered
into a binding acquisition agreement with Mining and Energy Group Pty Ltd (MEG) to acquire MEG's tintungsten and lithium-caesium-tantalum rights at the strategic EL8958 tenement. This acquisition has
expanded Kali’s footprint in the Jingellic Lithium Project by an additional 226 km², enhancing its Lachlan Fold
Belt Project in Southern New South Wales. The $225,000 option fee was paid in scrip, based on the 30-day
volume-weighted average price of Kali shares prior to the Option Expiry Date on 3 March 2024. The
acquisition connects two central tenements of the Jingellic Lithium Project, enabling continuous exploration
across the Lachlan Fold Belt. Previous exploration at EL8958 has identified tin anomalies along regional fault
lines, and Kali plans to incorporate this promising new landholding into its ongoing exploration program.
ANNUAL REPORT 2024
Page 10 of 81
DIRECTORS’ REPORT (CONTINUED)
Figure 6. Location map of Kali Metals’ Jingellic and Tallangatta Projects
The Company's initial exploration efforts concentrated on the highly promising Sweetwater Creek area
(EL9403), which includes the "Giant Pegmatite” 3. Rock chip sampling over a ~50m strike length confirmed
significant lithium mineralisation, with assays revealing concentrations ranging from 0.66% - 1.54% Li2O
(Figure 7 and Figure 8; Table 3 and Table 4). The strong correlation between lithium and pathfinder elements
such as caesium, tantalum, tin, and beryllium underscores the Giant Pegmatite's classification as an LCT-type
deposit, bolstering the Company's exploration model for this emerging region.
2F
XRD analysis of the rock chip samples from the Giant Pegmatite has confirmed that Spodumene is the
dominant lithium-bearing mineral phase in two out of the three samples with the other sample containing
the lithium-bearing mineral petalite (Table 3).
3
Refer KM1 ASX Announcement, 7 March 2024.
ANNUAL REPORT 2024
Page 11 of 81
DIRECTORS’ REPORT (CONTINUED)
Table 3. Sweetwater Creek Prospect rock chip samples
Prospect
Sample
ID
Easting (m)
Northing
(m)
Description
Giant Pegmatite
P794201
524134
6025237
Aplite
Giant Pegmatite
P794202
524140
6025235
Aplite
Giant Pegmatite
P794203
524111
6025251
Aplite
Giant Pegmatite
P794204
524091
6025245
Aplite
BFG Pegmatite
JR0001
520823
6024963
Aplite
BFG Pegmatite
JR0002
520770
6024933
Aplite
BFG Pegmatite
JR0003
520712
6025039
Aplite
Table 4. Sweetwater Creek rock chip assays
Prospect
Sample
ID
Li (ppm)
Li2O %
Be
(ppm)
Cs
(ppm)
Sn
(ppm)
Ta
(ppm)
K/Rb*
Giant Pegmatite
P794201
4583
0.99
130
339
1045
50
19
Giant Pegmatite
P794202
7146
1.54
152
256
1648
54
17
Giant Pegmatite
P794203
3057
0.66
139
135
1055
46
22
Giant Pegmatite
P794204
4635
1.0
138
185
569
45
20
BFG Pegmatite
JR0001
140
0.03
2
79
306
37
21
BFG Pegmatite
JR0002
201
0.04
2
105
202
26
23
BFG Pegmatite
JR0003
410
0.09
2
101
156
59
21
Table 5. Giant Pegmatite rock chip XRD analyses (major mineralogy wt %)
Sample
ID
Mica
Petalite
Potassium
Feldspar
Sodium
Feldspar
Quartz
Spodumene
P794201
12
10
28
27
12
P794202
11
7
23
30
18
P794204
14
8
26
23
2
14
In February 2024, Kali completed a ~50 km² airborne LiDAR survey over the Sweetwater Creek prospect,
identifying several previously unknown pegmatite dykes. Among these, the "BFG Pegmatite," consisting of
two dykes merging over a ~1km strike extent, exhibited highly fractionated characteristics, confirming its LCT
affinities.
ANNUAL REPORT 2024
Page 12 of 81
DIRECTORS’ REPORT (CONTINUED)
Figure 7. Sweetwater Creek prospect surface geochemical program location map
Figure 8. Sweetwater Creek prospect LiDAR enhanced hillshade image depicting newly identified pegmatite dykes at the BFG
prospect
The Sweetwater Creek area also hosts historical tin mines, including the Mullengandra and McLurg’s tin
mines, where recent reviews of historical data have revealed tantalum alongside high-grade tin
mineralisation, enhancing the area's potential. However, these historical findings require independent
validation through further sampling.
ANNUAL REPORT 2024
Page 13 of 81
DIRECTORS’ REPORT (CONTINUED)
Within the Company’s tenements at the nearby McLurg’s Gully tin mine, located ~1.1kms North West of the
Mullengandra tin mine, one historical quartz vein rock chip sample reported 11.4% Sn and 1060 ppm tantalum
associated with coarse nuggety cassiterite mineralisation 4. A historical data review has recently been
completed, revealing that these high-grade tin-bearing workings also contain elevated amounts of tantalum,
adding to the potential prospectivity of the area (Table 6).
3F
Figure 9. Location map of historical tin mines and rock chip sample assays, Sweetwater Prospect, Jingellic Project
Table 6. Mullengandra Tin Mine rock chip results 5
4F
Sample
ID2
Northing Easting
SC1
Sn
(ppm)
Nb
(ppm)
Ta
(ppm)
Prospect
Lithology
6025180 522040 2030
56
68
Hunter and Parsons
Aplite
SC2
6025180 522080 1450
55
68
Hunter and Parsons
Aplite
SC3
6024730 522790 17000
50
90
Mullengandra/Jupiter/Bright Star
Vein quartz
SC4
6024730 522790 20
<10
<10
Mullengandra/Jupiter/Bright Star
Vein quartz
SC5
6024730 522790 420
<10
<10
Mullengandra/Jupiter/Bright Star
Vein quartz
SC6
6024730 522790 25800
70
70
Mullengandra/Jupiter/Bright Star
Vein quartz
SC7
6024730 522790 1010
70
70
Mullengandra/Jupiter/Bright Star
Aplite
SC8
6024730 522790 1290
60
70
Mullengandra/Jupiter/Bright Star
Aplite
SC9
6024730 522790 1470
80
70
Mullengandra/Jupiter/Bright Star
Aplite
4
22002, Brady, John, Annual Report On Exploration Undertaken On Exploration Licence 5907 (Sweetwater Creek) For The Period
November 22, 2001 - November 21, 2002.
5
Refer KM1 ASX Announcement, 24 April 2024.
ANNUAL REPORT 2024
Page 14 of 81
DIRECTORS’ REPORT (CONTINUED)
Sample
ID2
Northing Easting
SC10
Sn
(ppm)
Nb
(ppm)
Ta
(ppm)
Prospect
Lithology
6025920 522530 1340
50
60
McLurg's Gully tin mine
Aplite
SC11
6025920 522530 4830
100
120
McLurg's Gully tin mine
Aplite
SC12
6025920 522530 11700
120
120
McLurg's Gully tin mine
Greisen
SC13
6025920 522530 1560
20
20
McLurg's Gully tin mine
Vein quartz
SC14
6025820 522650 690
30
30
McLurg's Gully tin mine
Aplite
SC15
6025820 522650 4900
110
130
McLurg's Gully tin mine
Aplite
SC16
6025820 522650 110400
1190
1060
McLurg's Gully tin mine
Pegmatite
SC17
6025820 522650 150
30
<10
McLurg's Gully tin mine
Greisen
SC18
6025820 522650 44000
440
410
McLurg's Gully tin mine
Pegmatite
SC19
6025760 522730 10700
120
130
McLurg's Gully tin mine
Pegmatite
SC20
6025760 522730 330
60
30
McLurg's Gully tin mine
Greisen
SC21
6025760 522730 100
20
<10
McLurg's Gully tin mine
Aplite
SC22
6024330 523270 11600
160
120
Jupiter tin mine
greisen/granite
SC23
6024330 523270 50
10
<10
Jupiter tin mine
Aplite
SC24
6024330 523270 11400
20
10
Jupiter tin mine
Vein quartz
SC25
6025120 522080 26500
290
250
Hunter and Parsons' mine
Greisen
SC26
6025120 522080 3930
80
70
Hunter and Parsons' mine
Greisen
SC27
6025680 525890 4450
50
70
McLurg's Gully tin mine
Greisen
SC28
6024730 522790 2820
60
70
Mullengandra/Jupiter/Bright Star
Granite
SC29
6023920 523280 4160
20
20
Jupiter tin mine
Vein quartz
SC30
6023750 522900 640
<10
<10
Jupiter tin mine
Vein quartz
SC31
6023640 522650 <10
<10
<10
Jupiter tin mine
Vein quartz
breccia
SC32
6023620 522400 20
<10
<10
Jupiter tin mine
Vein quartz
breccia
Table 7. Mullengandra Tin Mine rock chip results
Prospect
Sample ID
Sn (ppm)
SnO2 %
Ta (ppm)
Li (ppm)
Li2O %
Cs (ppm)
Mullengandra tin mine
JR0007
229
0.03
7
265
0.057
87
Mullengandra tin mine
JR0008
136
0.02
3
36
0.008
14
Mullengandra tin mine
JR0009
1937
0.25
35
18
0.004
115
Mullengandra tin mine
JR0010
1848
0.24
79
24
0.005
41
McLurg's Gully tin mine
JR0012
5370
0.70
78
36
0.008
146
ANNUAL REPORT 2024
Page 15 of 81
DIRECTORS’ REPORT (CONTINUED)
Additionally, Kali has completed a soil geochemistry sampling program over the Sweetwater Creek prospect,
with approximately 600 samples collected across a 13.7 km² area. The results are currently undergoing
compilation, QAQC analysis, and interpretation.
Kali secured NSW government approvals to conduct low-impact exploration activities within the
Mullengandra and Woomargama State Conservation Areas, which are highly prospective for both LCTbearing pegmatites and tin-tantalum mineralisation (EL9403 and EL9507). This access enables Kali to advance
its exploration strategy with further soil geochemistry sampling programs in these areas.
Additionally, Kali has completed a soil geochemistry sampling program and received NSW government
approvals to conduct exploration within key State Conservation Areas.
POST REPORTING PERIOD ACTIVITY
Spargoville
Post-reporting period, Kali reported assay results from its Phase 1 drill program at Spargoville (refer Table 8
and Table 9, Figure 10 and Figure 11). The program aimed to test beneath outcropping pegmatites and
geochemical anomalies for lithium potential, with drilling reaching depths of up to 100m.
Figure 10. Completed RC drilling at Flynn-Giles prospect targeting outcropping LCT pegmatites
ANNUAL REPORT 2024
Page 16 of 81
DIRECTORS’ REPORT (CONTINUED)
Figure 11. Completed RC drilling at Green Flame prospect targeting outcropping LCT pegmatites
The results have been instrumental in enhancing the Company’s understanding of the geological setting at
the Flynn-Giles and Green Flame prospects. Key findings include fertile spodumene-bearing LCT pegmatites
within ultramafic host rock, with pegmatites up to 16m thick and dipping shallowly to the east. These insights
will be critical for designing the Phase 2 drill program at the Walton, Parker-Grubb, and Flynn-Giles East
prospects.
ANNUAL REPORT 2024
Page 17 of 81
DIRECTORS’ REPORT (CONTINUED)
Figure 12. Cross-section A-A’ looking north with drill intersections and modelled pegmatites
Figure 13. Cross-section B-B’ looking north with drill intersections and modelled pegmatites
ANNUAL REPORT 2024
Page 18 of 81
DIRECTORS’ REPORT (CONTINUED)
Kali announced the completion of an initial review of historic drill core at the Spargoville Project with
preliminary findings identifying numerous intersected pegmatites. The drilling was mostly focused on gold
mineralisation with zero or little focus on the Lithium potential of the new area. The early stages of the review
focused
Share your feedback
Discover