Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX Announcement
17 January 2025
December 2024 Quarterly Activities Report
Kali Metals Limited (“Kali” or “the Company”) is pleased to present its Quarterly Report (“Report”) for the
period ended 30 December 2024 (“Quarter”). During the Quarter, Kali was focused on the expansion of its
Earn-In Agreement (“JV”) with SQM Australia1 at DOM’s Hill and Pear Creek in the Pilbara, and the completion
of mapping and sampling programs at its 100%-owned Marble Bar Project, also in the Pilbara. In New South
Wales, Kali completed a rock chip sampling program at the Sweetwater area within the Jingellic Project which
returned promising high-grade tin-oxide results. At Higginsville, Kali continued to progress its geophysical
review of the entire Project with a view towards target generation.
Highlights
Summary
Kali finished the December 2024 Quarter in a strong cash position ($7.15M) following ongoing exploration
work which focused on the Marble Bar Project in the Pilbara and the Jingellic Project in the Southern Lachlan
Fold Belt Project in NSW. The Company also announced it had finalised an agreement to acquire additional
tenure in the Pilbara and amend the terms of its existing Earn-In Agreement with SQM Australia.
Pilbara
SQM Australia Joint Venture
•
Kali expanded and amended the SQM Australia JV. Under the revised terms:
o Kali incorporated three new tenements into the JV, acquired from major shareholder Kalamazoo
Resources Limited (“ASX: KZR”) (“Kalamazoo”);
o SQM Australia agreed to spend a minimum of $500,000 on exploration by 15 December 2025 to
retain its 30% interest in Kali’s DOM’s Hill and Pear Creek tenements;
o SQM Australia committed to an additional $1,000,000 of expenditure, now $4,250,000 by 15
December 2026, to earn a 50% interest in the expanded JV tenements; and
o Kali retained 100% ownership of its Marble Bar Project, which has subsequently demonstrated
positive gold potential in addition to the existing lithium prospectivity
Marble Bar Project
•
At the 100%-owned Marble Bar Project, Kali utilised historical soil sampling results to identify a large,
coherent gold-in-soil anomaly, cumulatively >5.1km in strike length2
•
Assays from rock-chip sampling programs identified gold mineralisation on surface and confirmed
significant lithium potential. The standout results returned from the three areas explored include3:
o Tiger Gold Prospect: Rock chips up to 3.0g/t gold from multiple outcropping steeply dipping quartz
veins (up to 5m wide in outcrop) in monzogranite from geological mapping over a 400x400m area
o Sherman Gold Prospect: Seven rock-chip samples collected during November from the Sherman
Prospect, with best results up to 4 g/t gold returned from a quartz vein measuring 120m in length
and up to 7m in width
1
Refer section 2.2(a)(iii) of the Prospectus dated 3 November 2023.
Refer KM1 Announcement dated 11 December 2024.
3
Refer KM1 Announcement dated 11 December 2024.
2
ASX : KM1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 1 of 23
Panther Lithium Prospect: Up to 1.5% Li2O in rock chip samples from a LCT pegmatite, locally up
to 15-20m wide in outcrop (assumed >10m true width), with multiple >1% Li 2O outcrop samples
over the 1.1km strike length
Kali obtained > 600 historical soil samples not previously assayed for gold. These samples were collected
on a 200x100m grid in 2021 by Kalamazoo. Results to be released in the March quarter
o
•
•
Aboriginal heritage surveys over four emerging gold prospects at Marble Bar completed during November
2024
Southern Lachlan Fold Belt Projects
•
Kali announced results from a rock-chip sampling program at its 100%-owned tenement (EL9403) at the
Jingellic Project in New South Wales with best results up to 8.0% SnO2, along with accessory tantalum (up
to 560ppm Ta) and niobium (up to 490ppm Nb)4
•
Twenty-one rock chip samples were collected during the geological mapping campaign at the Sweetwater
area, following-up on soil anomalies up to 3.5km long. Results expected in the March Quarter
•
The outcropping tin-bearing greisen-pegmatite zones range in width from 2-20m, mapped along a
cumulative length of 2km, and are still open along strike
Higginsville Lithium District
•
Kali focused its efforts on reconnaissance, mapping, continued 3-D modelling of pegmatites and a
comprehensive geophysical survey review of the entire Higginsville Project area, with a view towards
target generation and drilling of the highest ranked targets later in 2025
Corporate
•
John Leddy resigned from his role as Non-Executive Director of Kali Metals
•
Strong cash position, with $7.15M available at the end of the quarter, with zero debt
Figure 1: Kali’s portfolio of Australian lithium assets
4
Refer KM1 Announcement dated 4 December 2024.
ASX : KM1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 2 of 23
Pilbara Projects
Additional Pilbara tenure added and expanded JV with SQM Australia
Kali’s Pilbara Projects include DOM’s Hill, Marble Bar and Pear Creek, adjacent to world-class lithium deposits
Pilgangoora 414Mt @ 1.15% Li2O and Wodgina 259Mt @ 1.17% Li2O (Refer Figure 2).
During the Quarter, Kali advised it had reached an agreement with SQM Australia, the existing JV partner in its
exploration projects in the Pilbara, to expand the area of the JV and amend the terms of the existing Earn-In
Agreement.
As part of the expanded JV, Kali entered into binding transaction documentation to acquire the following
strategic additional Pilbara tenements:
•
DOM’s Hill: Exploration License applications E45/6646 and E45/6647, contiguous to the South-West
and East of Kali’s DOM’s Hill Project (Refer Figure 2).
As part of a preliminary due diligence, Kali completed a desktop review to evaluate the lithium
prospectivity of the additional tenements. The new tenements host a large volume of Aplite rock,
indicating potential as a favourable geological setting for pegmatite emplacement.
Kali acquired the new DOM’s Hill tenements from major shareholder Kalamazoo for cash consideration
of $100,000 + GST.
•
Pear Creek: Exploration License E45/6457 is located contiguously to the South of Kali’s existing Pear
Creek Project (Refer Figure 2). Kali’s preliminary due diligence on E45/64567 suggests further
exploration to test lithium mineralisation at this tenement is warranted.
•
Kali acquired E45/6457 from Kalamazoo for $20,000 + GST.
The new tenements, which increase the Company’s Pilbara landholding by ~129km 2, are contiguous to the
Company’s existing tenement portfolio in the Pilbara, so the Company is well placed to capitalise on cost
synergies in its exploration of this new tenure.
The Company has also renegotiated the terms of its Earn-In Agreement with SQM Australia. Key amendments
include:
•
Newly acquired tenements (above) to be incorporated into the JV;
•
SQM Australia to spend a minimum of $500,000 on exploration by 15 December 2025 to retain its
30% interest in Kali’s DOM’s Hill and Pear Creek tenements;
•
SQM Australia have committed to an additional $1,000,000 of expenditure, now $4,250,000 by 15
December 2026, to earn a 50% interest in the expanded JV tenements; and
•
Kali to retain 100% ownership of Marble Bar Project (Refer Figure 2).
ASX : KM1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 3 of 23
Figure 2. Kali Metals Pilbara Tenure
Marble Bar Lithium-Gold Project
Soil Sampling – New Gold Anomaly Discovered
In September 2024, reconnaissance mapping and sampling over the Marble Bar Project area targeted both
LCT pegmatites and quartz veining for gold potential. Initial areas of gold focus included the Tiger and
Sherman Prospects, with the primary focus on Tiger where rock-chip results recorded values up to 2.95 g/t
gold5. A single, isolated rock-chip sample from Sherman recorded a value of 1.71 g/t gold. 6
Simultaneously, multi-element geochemistry results from a historical soil sampling program, conducted in late
2021 by Kalamazoo pursuant to the JV, were compiled.
From the historical results, Kali has delineated a cumulative, coherent, 5.1km long WNW striking gold-in-soil
anomaly, interpreted to be bisected by several, off-setting north-east striking structures. The mineralised
structures at both the Sherman and Tiger Prospects are dominated by WNW trending quartz veins, in the
same orientation as the gold-in-soil anomalies (Refer Figure 3). The Tiger Prospect also contains a second set
of mineralised quartz veins trending N to NE.
5
6
KM1 ASX Announcement 15 October 2024.
KM1 ASX Announcement 15 October 2024.
ASX : KM1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 4 of 23
Figure 3. Marble Bar Project (SW area) gold-in-soil results and location of soil samples for re-assay
Rock Chip Sampling Results
The Sherman Gold Prospect was identified during reconnaissance in September 2024 when a sole, isolated
rock-chip sample taken at this locality returned 1.71 g/t gold 7 (2409MBR023). During November 2024, 22
rock-chip samples were collected over the Marble Bar Project and analysed at ALS Perth using Au-ICP22
method. Of the 22 rock-chip samples, seven rock chips were taken from the Sherman Prospect, with four
returning mineralised values up to 4.0 g/t gold 8 (Refer Figures 3, 4 & 6).
The gold-bearing quartz vein appears to be subvertical and has significant width at surface of up to 7m. The
quartz vein has been mapped and sampled for 120m in WNW-ESE direction and remains open along strike
(albeit the quartz vein is being increasingly covered by scree and soil further along strike). A thinner, subparallel
quartz vein has been mapped near the main quartz vein, with a sole sample returning 2.95 g/t gold 9, suggesting
potential for other subparallel gold-bearing quartz veins at the Sherman Prospect.
The quartz veins at Sherman are orogenic. The quartz is often brecciated, with signs of sulphidic alteration in
quartz (cubic iron-oxide mineral relicts and pits 1-5mm in size) and with potassic alteration at the contact with
syenogranitic host rocks.
The encouraging results to date from Sherman Gold Prospect build upon Kali’s outcrop sampling 2km west at
the Tiger Prospect where rock-chip samples included values up to 3.0 g/t gold within outcropping quartz veins
over a 400x400m area10. Both the Tiger and Sherman Prospects warrant further follow up with both vein
7
KM1 ASX Announcement 15 October 2024.
KM1 ASX Announcement 15 October 2024.
9
KM1 ASX Announcement 15 October 2024.
10
KM1 ASX Announcement 15 October 2024.
8
ASX : KM1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 5 of 23
prospects yet to be fully mapped and sampled.
Figure 4. Sherman Gold Prospect geology plan map showing sampling locations
Figure 5. Tiger Gold Prospect, plan view showing quartz veins and rock sampling results
ASX : KM1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 6 of 23
Figure 6. Marble Bar project geology and exploration prospects identified to date
Panther Lithium Prospect
The Panther Lithium Prospect, located on E45/5970, is hosted in gneissic granites, intruded by several LCT
pegmatites containing lithium minerals lepidolite and spodumene (mineralogy confirmed in thin sections 11),
accompanied by zinnwaldite, muscovite, quartz, feldspar and albite. This pegmatite field comprises a main
pegmatite dyke and its splays, and several subparallel thinner pegmatites (<3m wide in outcrop).
The rock chip sampling results announced in October confirm the main pegmatite is up to 15-20m wide in
outcrop and 1.4km long – with the best rock-chip results occurring over a strike length of 1.1km.
During the reconnaissance, 10 rock-chip samples were collected over the LCT pegmatites at E45/5970. The
aim of this sampling was to check for continuity of high-grade lithium mineralisation along the main pegmatite
trend. While all samples have returned anomalous results, the best results have been returned from the main
(widest) pegmatite outcrop, up to 1.5% Li2O12. The average spacing of rock-chip samples along the 1.4km
length of main pegmatite is 75m (Refer Figure 7).
11
12
Refer KM1 Prospectus dated 3 November 2023.
KM1 ASX Announcement 15 October 2024.
ASX : KM1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 7 of 23
Figure 7. Panther Lithium Prospect, plan view showing outcropping pegmatites, recent rock sampling
results, historical rock-chip sampling and historical drilling 13
13
Refer ITAR in the Company’s Prospectus dated 3 November 2023.
ASX : KM1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 8 of 23
Figure 8. Panther Lithium Prospect, photo showing outcropping pegmatite and rock sampling results
Southern Lachlan Fold Belt Projects
Kali holds the Jingellic (NSW) and Tallangatta (VIC) Projects in the Southern Lachlan Fold Belt (Refer Figure 9).
The Southern Lachlan Fold Belt hosts sites associated with economically significant production of precious
and base metals, including tin and tungsten.
Jingellic Lithium Project
The Jingellic Project covers approximately 1,220km2 consisting of tenements EL9403, EL9507 and EL895814.
Kali’s initial exploration focus has been on EL9403 and the highly prospective Sweetwater area which contains
several historic tin mines and the recently identified lithium-bearing pegmatites15.
14
15
The Company owns the tin, tungsten, lithium, caesium and tantalum rights to EL8958.
KM1 ASX Announcement 28 June 2024
ASX : KM1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 9 of 23
Figure 9. Location map of Kali Metals’ Jingellic and Tallangatta Projects
Sweetwater Area
The main tin mines around Sweetwater include the Mullengandra, McLurg’s and Parsons-Hunter mines (as well
as dozens of smaller workings) which were active in the early 1900s. Tin mineralisation is associated with the
mineral cassiterite (the main economic tin mineral). Kali has initially completed a historical data review,
revealing these high-grade tin-bearing workings also contain significant amounts of tantalum and niobium,
adding to the potential prospectivity of the area.16
The Sweetwater area also hosts notable LCT pegmatites, with the two most prominent pegmatites identified
to date being the Giant Pegmatite and the BFG Pegmatite. The Company has recently collected four rock chip
samples at the Giant Pegmatite with assay results confirming LCT-type mineralisation ranging from 0.661.54% Li2O17. The BFG pegmatite is made of two dykes with 1km total length, identified from LiDAR imagery.
A LiDAR survey carried out in February 2024 has proved useful in identifying the long-forgotten historical tin
workings. Soil sampling, carried out during Q3 2024, identified several km-scale tin, tungsten, tantalum and
lithium anomalies18.
16
KM1 ASX Announcement 28 June 2024.
KM1 ASX Announcement 28 June 2024.
18
KM1 ASX Announcement 10 September 2024.
17
ASX : KM1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 10 of 23
Figure 10. Sweetwater area location map
Rock Chip Sampling Results
Following up on encouraging Sn-Li-Ta soil sampling results19, Kali has completed a geological mapping
program along the zones of interest.
Rock samples (1.5-2kg material from each sampling location) were collected from mineralised and
characteristic rock units identified in the field. So far, 21 rock samples had been collected and analysed in the
ALS laboratory in Perth. Analytical method ME-XRF15b was selected as appropriate for the style of tin
mineralisation at the Sweetwater area.
The rock chip sampling results collected so far have returned five high-grade samples of > 1% SnO2 (up to an
exceptional 7.99% SnO2) and seven lower grade samples between 0.1% and 1.0% tin-oxide, all accompanied
with encouraging tantalum and niobium levels 20.
19
20
KM1 ASX Announcement 10 September 2024.
KM1 ASX Announcement 4 December 2024.
ASX : KM1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 11 of 23
a)
b)
Figure 11. Coarse cassiterite (tin-oxide, encircled) from the two main “greisen” trends at the Sweetwater area: a)
Mullengandra trend (Sample SWR007) and b) McLurg’s trend (Sample SWR012)
Cautionary statement: Visual estimates of mineral abundance should never be considered a proxy or substitute for
laboratory analyses where concentrations or grades are the factor of principal economic interest. Visual estimates
also potentially provide no information regarding impurities or deleterious physical properties relevant to valuations
Geological Mapping
The cassiterite mineralisation is associated with development of “greisen” alteration (in wider sense) in
Ordovician sediments, outcropping to the north of the contact with the Silurian two-mica S-type granite. The
strata is steeply dipping to ENE.
The ongoing mapping has focused on confirming the presence of cassiterite along the identified greisen
zones. The length of these “greisen” zones varies from 100m to >2km. Two main greisen trends are the
southern Mullengandra trend (cassiterite confirmed in rocks >1.2km length; trend open to SE) and northern
McLurg’s trend (cassiterite confirmed in rocks >800m length; trend open to SE and NW), passing through the
respective historical tin mines. A third, potentially significant, cassiterite-bearing greisen trend, “Keogh”, has
been inferred from LiDAR and soil geochemistry.
The width of individual greisen zones observed on surface varies from metres to dozens of metres.
ASX : KM1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 12 of 23
Figure 12. Sweetwater area, geology plan map showing rock samples
Other Activities
During the quarter, Kali also completed the following exploration activities at the Jingellic and Tallangata
Projects:
•
Infill soil sampling was completed to further constrain the soil anomalies over the identified anomalous
trends. Some 287 samples have been collected, with all results still pending (likely to be reported
during Q1 2025). The soil sampling consisted of 150x150m infill and orientation surveys (10m spacing)
over the Giant Pegmatite, and historical workings at Mullengandra and McLurg’s.
•
Rock petrography conducted by tin expert Dr Roger G. Taylor has been completed. The main minerals
of interest (cassiterite and spodumene) were confirmed in thin sections. The report findings were
integrated into the ongoing geological mapping campaign.
•
Literature review and desktop studies for regional tin (and lithium) prospectivity have been completed.
Review of the desktop study is ongoing.
•
Given how useful LiDAR has proven to be over the Sweetwater area, Kali has engaged GeoCloud
Analytics and MNG Survey to complete a 50km2 data acquisition (and data processing/interpretation)
for Mt Cudgewa prospect on EL7786 at the Tallangata Project (VIC). The Mt Cudgewa Prospect hosts
known hard rock tin prospects and known pegmatite occurrences, on hilly Crown land not under
license by private or corporate entities.
•
Designing the soil sampling grid expansion into the eastern EL9507 Woomargama State Conservation
Area (access now granted) is ongoing. This plan will await the LiDAR data acquisition over Mt Cudgewa
and propose a soil sampling program over both EL9507 and EL7786 tenements.
ASX : KM1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 13 of 23
Higginsville Lithium District
The Higginsville Lithium District covers approximately 1,571km 2 of land holding with Kali owning 100% of the
lithium and associated battery mineral rights across these tenements.
Within the Higginsville Lithium District portfolio, eight Projects (Refer Figure 13) have been identified as having
a prospective geological setting to host LCT pegmatites. Some of these areas have existing mapped
outcropping pegmatites with Spodumene identified, while in other areas, pegmatite occurrences have been
logged as part of the historic core review program.
During the Quarter, as previously disclosed,21 Kali focused its efforts on reconnaissance, mapping, continued
3-D modelling of pegmatites and a comprehensive geophysical survey review of the entire Higginsville Project
area, with a view towards target generation and drilling of the highest ranked targets later in 2025.
Figure 13: Higginsville Lithium District
21
KM1 ASX Announcement 6 August 2024.
ASX : KM1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 14 of 23
Corporate
Resignation of Non-Executive Director
Kali advised that John Leddy has resigned from his role as non-executive director effective 30 September
2024. Mr Leddy served on the Company’s board as a representative of Karora Resources Limited (“Karora”)
prior to and post the Company’s Initial Public Offer. Following completion of the merger between Karora and
Westgold Resources Limited, Mr Leddy tendered his resignation. The Company would like to acknowledge Mr
Leddy’s contribution to the organisation and thank him for his service.
2024 Annual General Meeting
Kali held its 2024 Annual General Meeting on Wednesday 20 November in Perth, Western Australia.
View the AGM presentation on the Kali Metals website. View the AGM voting results at
https://app.sharelinktechnologies.com/announcement/asx/0c73146ad1622042906fd4b149015c3c.
Compliance
For the purpose of Listing Rule 5.3.1, details of the Company's group exploration activities for the Quarter,
including any material developments or material changes in those activities, and a summary of the expenditure
incurred on those activities is set out in the relevant sections above.
For the purpose of Listing Rule 5.3.2, the Company confirms that there were no mining production and
development activities during the Quarter by the Company or its subsidiaries.
In accordance with ASX Listing Rule 5.3.4, a comparison of the use of funds as per the Kali Prospectus dated
3 November 2023 (Prospectus) and actual use of funds since ASX admission is presented below:
Prospectus estimate
(2 year period
following admission)
Actual use from
admission until 30
December 2024
Variance
Exploration Expenditure
10.65
4.90
5.75
Exploration management, staff,
& administration
3.85
2.53
1.32
Expenses of the Offer
1.78
1.99
(0.21)
Total
16.28
9.43
6.85
Use of Funds
($ million)
A favourable variance in Exploration Expenditure and administration being below the Prospectus estimates
are due to the Company only being admitted in January 2024 and accordingly, being less than 12 months into
the period of 2 years underlying the Prospectus estimates.
Actual expenses of the offer were higher than estimated due to the cost overrun on legal expenses associated
with the Offer. In accordance with ASX Listing Rule 5.3.5, payments to related parties during the Quarter as
outlined in Sections 6.1 and 6.2 of the Appendix 5B consisted of $115k in directors’ fees and fees to the
Managing Director under his executive services agreement.
ASX : KM1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 15 of 23
Tenement Summary
The following information is provided pursuant to Listing Rule 5.3.3 for the quarter ended 30 December
2024.
Pilbara Project
Tenement
% Beginning of Period
% End of Period
E45/4722-I
100%
100%
E45/4887
100%
100%
E45/4919
100%
100%
E45/5146
100%
100%
E45/5943
100%
100%
E45/5934
100%
100%
E45/5935
100%
100%
E45/4700
100%
100%
E45/5970
100%
100%
E45/3856-I
100%
100%
E45/4616-I
100%
100%
E45/5813
100%
100%
E45/6646
0%
100%
E45/6647
0%
100%
E45/6457
0%
100%
Higginsville Lithium District
Tenement
% Beginning of Period
% End of Period
100%1
E15/1037
100%
E15/1094
100%1
100%1
E15/1197
100%1
100%1
E15/1199
100%1
100%1
E15/1203
100%1
100%1
E15/1223
100%1
100%1
E15/1260
100%1
100%1
E15/1298
100%1
100%1
E15/1402
100%1
100%1
E15/1423
100%1
100%1
E15/1448
100%1
100%1
E15/1458
100%1
100%1
E15/1459
100%1
100%1
E15/1461
100%1
100%1
E15/1462
100%1
100%1
E15/1464
100%1
100%1
E15/1487
100%1
100%1
E15/1512
100%1
100%1
E15/1533
100%1
100%1
E15/1541
100%1
100%1
E15/1586
100%1
100%1
ASX : KM1
1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 16 of 23
E15/1613
100%1
100%1
E15/1620
100%1
100%1
E15/1628
100%1
100%1
E15/1792
100%1
100%1
E15/1793
100%1
100%1
E15/1822
100%1
100%1
E15/1853
100%1
100%1
E15/1863
100%1
100%1
E15/1882
100%1
100%1
E15/1939
100%1
100%1
E15/1940
100%1
100%1
E15/786
100%1
100%1
E15/808
100%1
100%1
E15/810
100%1
100%1
E15/828
100%1
100%1
E63/1051
100%1
100%1
E63/1117
100%1
100%1
E63/1142
100%1
100%1
E63/1165
100%1
100%1
E63/1712
100%1
100%1
E63/1724
100%1
100%1
E63/1725
100%1
100%1
E63/1726
100%1
100%1
E63/1727
100%1
100%1
E63/1728
100%1
100%1
E63/1738
100%1
100%1
E63/1756
100%1
100%1
E63/1763
100%1
100%1
E63/1876
100%1
100%1
E63/1881
100%1
100%1
E63/1900
100%1
100%1
E63/1901
100%1
100%1
E63/2107
100%1
100%1
E63/2108
100%1
100%1
E63/2275
100%1
100%1
M15/1132
100%1
100%1
M15/1133
100%1
100%1
M15/1134
100%1
100%1
M15/1135
100%1
100%1
M15/1790
100%1
100%1
ASX : KM1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 17 of 23
M15/1792
100%1
100%1
M15/1806
100%1
100%1
M15/1814
100%1
100%1
M15/1828
100%1
100%1
M15/1872
100%1
100%1
M15/1873
100%1
100%1
M15/225
100%1
100%1
M15/231
100%1
100%1
M15/289
100%1
100%1
M15/31
100%1
100%1
M15/325
100%1
100%1
M15/338
100%1
100%1
M15/348
100%1
100%1
M15/351
100%1
100%1
M15/352
100%1
100%1
M15/375
100%1
100%1
M15/506
100%1
100%1
M15/507
100%1
100%1
M15/512
100%1
100%1
M15/528
100%1
100%1
M15/580
100%1
100%1
M15/581
100%1
100%1
M15/597
100%1
100%1
M15/610
100%1
100%1
M15/616
100%1
100%1
M15/620
100%1
100%1
M15/629
100%1
100%1
M15/639
100%1
100%1
M15/640
100%1
100%1
M15/642
100%1
100%1
M15/651
100%1
100%1
M15/665
100%1
100%1
M15/680
100%1
100%1
M15/681
100%1
100%1
M15/682
100%1
100%1
M15/683
100%1
100%1
M15/684
100%1
100%1
M15/685
100%1
100%1
M15/710
100%1
100%1
M15/748
100%1
100%1
ASX : KM1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 18 of 23
M15/757
100%1
100%1
M15/758
100%1
100%1
M15/786
100%1
100%1
M15/815
100%1
100%1
M15/817
100%1
100%1
M15/820
100%1
100%1
M63/165
100%1
100%1
M63/230
100%1
100%1
M63/236
100%1
100%1
M63/255
100%1
100%1
M63/269
100%1
100%1
M63/279
100%1
100%1
M63/329
100%1
100%1
M63/366
100%1
100%1
M63/368
100%1
100%1
M63/515
100%1
100%1
M63/516
100%1
100%1
M63/660
100%1
100%1
M63/662
100%1
100%1
P15/5958
100%1
100%1
P15/5959
100%1
100%1
P15/6179
100%1
100%1
P15/6229
100%1
100%1
P15/6230
100%1
100%1
P15/6231
100%1
100%1
P15/6234
100%1
100%1
P15/6239
100%1
100%1
P15/6240
100%1
100%1
P15/6575
100%1
100%1
P15/6582
100%1
100%1
P15/6657
100%1
100%1
P15/6658
100%1
100%1
P15/6664
100%1
100%1
P15/6847
100%1
100%1
P15/6848
100%1
100%1
P15/6863
100%1
100%1
P15/6864
100%1
100%1
P63/1468
100%1
100%1
P63/1587
100%1
100%1
P63/1588
100%1
100%1
ASX : KM1
Kali Metals Limited Ground Floor, 34 Colin St, West Perth WA 6005 Australia ABN: 85 653 279 371
P 08 6424 8880 E admin@kalimetals.com.au W www.kalimetals.com.au
Page 19 of 23
P63/1589
100%1
100%1
P63/1590
100%1
100%1
P63/1591
100%1
100%1
P63/1592
100%1
100%1
P63/1593
100%1
100%1
P63/1594
100%1
100%1
P63/2011
100%1
100%1
P63/2012
100%1
100%1
P63/2013
100%1
100%1
P63/2014
100%1
100%1
P63/2015
100%1
100%1
P63/2021
100%1
100%1
P63/2022
100%1
100%1
P63/2023
100%1
100%1
P63/2024
100%1
100%1
P63/2025
100%1
100%1
P63/2050
100%1
100%1
P63/2051
100%1
100%1
P63/2064
100%1
100%1
P63/2067
100%1
100%1
P63/2080
100%1
100%1
P63/2094
100%1
100%1
P63/2095
100%1
100%1
P63/2097
100%1
100%1
P63/2100
100%1
100%1
P63/2101
100%1
100%1
P63/2102
100%1
100%1
P63/2119
100%1
100%1
P63/2120
100%1
100%1
P63/2121
100%1
100%1
P63/2122
100%1
100%1
P63/212
Share your feedback